My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
153
>
2300 - Underground Storage Tank Program
>
PR0231389
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:39 AM
Creation date
2/14/2023 8:26:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231389
PE
2361
FACILITY_ID
FA0003709
FACILITY_NAME
BILLJAR VALERO
STREET_NUMBER
153
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336607
CURRENT_STATUS
01
SITE_LOCATION
153 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\bmascaro
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
416 2nd Street ® Drop Tube Integrity <br /> Afforda-Te$t Galt,Ca.95632 <br /> (209)744-0112(800)524-9087 FAX(209)744-0116 ❑ Static Torque & Rotation <br /> TEST DATE: 11/9/2022 TIME: <br /> TECHNICIAN NAME: <br /> SITE NAME: BILLJAR VALERO Ed Stearns SJV# AIR QUALITY AGENCY: SJVAPCD <br /> Site Address: 153 ELEVENTH STREET <br /> I declare, under penalty of perjury under the laws of the state of INSPECTOR NAME: <br /> City: TRACY California that based on information and belief formed after <br /> Phone: reasonable inquiry, the statements and information provided in ❑ Present ❑ Not Present <br /> the document are true,accurate,and complete. <br /> Contact: f,� <br /> � <br /> TECH SIGNATURE: � ` ❑ Strai ht ® Overfill Prevention Device <br /> Confirmation# Permit Equipment: <br /> Facility# ❑ Incline Manometer ❑Flow Meter Calibrated Dail <br /> DROP TUBE & OVERFILL PREVENTION DEVICE PRESSURE INTEGRITY TEST <br /> Drop Tube Drain Valve Pressure Test Drop Tube Overfill Prevention Device Test "Corrected"Overfill Device Leak Rate <br /> Flow Rate 80m1/min .17 Flow Rate 200 ml/min .42 <br /> Time to Minus Equals <br /> R-Regular reach 2" Drain Valve Final Time to reach 2" Overfill Leak Final Overfill Device Drain Valve Corrected Lk Rate <br /> P=Plus H2O at 80 Leak Rate Pressure H2O at 200 ml rate Pressure Leak Rate Leak Rate for Overfill Device <br /> S=Super ml/min 2"H2O—30 sec 2"H2O—30 Sec <br /> Tank Grade ml/min In H2O (in sec) ml/min In H2O ml/min ml/min ml/min <br /> 87 WEST 171 0 2.03 PASS <br /> 87 MID 168 0 2.08 PASS <br /> 91 166 0 2.01 PASS <br /> STATIC TORQUE & ROTATION <br /> Vapor Adaptor: j 2 3 4 Product Adaptor: 1 2 3 4 <br /> Brand: Brand: <br /> Model; I Model: I I <br /> Product Grade: Product Grade: <br /> Torque#1: Torque#1: <br /> Torque#2: Torque#2: <br /> Torque#3: I I Torque#3 I I I I I <br /> Average: Average: <br /> 360 Rotation --- --- --- --- 360 Rotation: --- --- --- --- <br />
The URL can be used to link to this page
Your browser does not support the video tag.