Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared:2/7/2023 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> U ST Monitoring Site Plan <br /> r----------------------------------------------------------------------------------------------------------------------------- <br /> --- <br /> i <br /> Site Address: WILSON WAY CHEVRON 437 WILSON WAY STOCKTON CA 95205 <br /> . . . . . . • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . <br /> TLS _ . . . . . . . . . <br /> STORE . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . R <br /> . . . . . . . . . . . . . . . . E <br /> . . . . . . . . . . . . . . . . . <br /> O <br /> 'Pwric* . . . . . . _ . . . . . N <br /> Draw-ine of piping . . . . . . . . . . . . . . . . . . . <br /> exit of sump and . . . . . . . . . . . . . . . . . . . T <br /> UDC'..\o . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> underground <br /> dram t= X S <br /> ACS31LaZRn R'e _ �' <br /> cannot speculate _ _ _ 91.•„ <br /> blue prints. P R <br /> `• E <br /> a E <br /> D <br /> e -- T <br /> KE . <br /> a=An-L'LAR . . _ . . T <br /> F=FELLS <br /> T=TURBINE <br /> P=PROBE T X <br /> A'=VAPOR <br /> X=SLIP SENSOR X <br /> L=Leak Detector <br /> !1I=Xfanway <br /> B=Brine Sensor <br /> I=Smart Sensor <br /> S-S'p <br /> C=Floats&Chain: <br /> E=E Stop <br /> "AnSON WAY <br /> OU item;underground Aw are not risible:o rhe certi{eing technician are a <br /> profe-,zional opinion only and are solei!for irtformanonal pmpor&:. Drenving <br /> not to scale <br /> Date map was drawn: 2/12/19 <br /> Instructions <br /> If you already have a diagram that shows al required information.you may include it rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly den*locations of the following equipment,if installed:monitoring system control panels;sensors monrionng tank <br /> annular spaces,sumps.dispenser pans.spill containers.or other secondary containment areas.mechanical or eliectronic line leak detectors:and in-tank liquid level <br /> probes(if used for leak detection). In the space prowled,note the date this Site Plan was prepared. <br /> Page 6 of 6 <br />