Laserfiche WebLink
STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA = O <br /> Mechanical Systems Mechanical Systems Mechanical Systems O Q ao <br /> NRCC-MCH-E CALIFORNIA ENERGY COMMISSION NRCC-MCH-E CALIFORNIA ENERGY COMMISSION NRCC-MCH-E CALIFORNIA ENERGY COMMISSION V <br /> CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE OF COMPLIANCE NRCC-MCH-E .� <br /> Project Name: DENNY'S REMODEL Report Page: (Page 10 of 15) Project Name: DENNY'S REMODEL Report Page: (Page 11 of 15) Project Name: DENNY'S REMODEL Report Page: (Page 12 of 15) <br /> Project Address: 4747 PACIFIC AVE. Date Prepared: 5/20/2022 Project Address: 4747 PACIFIC AVE. Date Prepared: 5/20/2022 Project Address: 4747 PACIFIC AVE. Date Prepared: 5/20/2022 i '; <br /> J.VENTILATION AND INDOOR AIR QUALITY L. DISTRIBUTION(DUCTWORK and PIPING) L. DISTRIBUTION(DUCTWORK and PIPING) = C <br /> DCV NA:Not required per 11 11 a space directly under a roof that has a U-factor greater than the u-factor of the ceiling,or if the roof does not meet the 11In a space directly under a roof that has a U-factor greater than the u-factor of the ceiling,or if the roof does not meet the :F. <br /> §120.1(d)3 requirements of§140.3(a)1B or if the roof has fixed vents or openings to the outside/unconditioned spaces <br /> requirements of§140.3(a)1B or if the roof has fixed vents or openings to the outside/unconditioned spaces <br /> SERVICE AREA All others 519 77.8 0 0 F <br /> OCc Sensor <br /> NA:Not required 13In an unconditioned crawl space 13In an unconditioned crawl space �_+ <br /> space type 11 In other unconditioned spaces 11 In other unconditioned spaces ' 3 M <br /> 17 Total System Required Min OA CFM 539 18 Ventilation for this System Complies? Yes 15 The scope of the project includes extending an existing ducts stem,which is constructed,insulated or sealed with asbestos. 15 The scope of the project includes extending an existing ducts stem,which is constructed,insulated or sealed with asbestos. V) N <br /> P P J g g Y P P J g g Y <br /> H <br /> lC <br /> FOOTNOTES:System CFM should include both mechanical and natural ventilation or the zone s stem <br /> F Y f /Y 16 The scope of the project includes an existing duct system that is documented to have been previously sealed as confirmed through field verification 16 The scope of the project includes an existing duct system that is documented to have been previously sealed as confirmed through field verification � a <br /> 'Air filtration requirements apply to the following three system types per§120.1(c)1A:space conditioning systems utilizing ducts to supply air to occupiable space;Supply-only and diagnostic testing in accordance with procedures in the Reference Nonresidential Appendix NA2. and diagnostic testing in accordance with procedures in the Reference Nonresidential Appendix NA2. G <br /> ventilation systems providing outside air to occupiable space;supplyside of balanced ventilation systems including heat recovery and energy recovery ventilation systems providing 17 Yes Duct system shall be sealed in acorda.nce with the California Mechanical Code 17 Yes Duct system shall be sealed in acorda.nce with the California Mechanical Code V r d IfY1 <br /> outside air to occupiable space. 7 L <br /> s The answers to the questions below apply to the following duct systems: RTU-2 Duct leakage testing triggered for these systems. Yes �� � � � <br /> Uniform Mechanical Code may have more stringent ventilation requirements;the most stringent code requirement takes precedence. 11 No The scope of the project includes only duct systems serving healthcare facilities M.COOLING TOWERS V �� Cn <br /> 'See Standards Tables 120.1-A and 120.1-B. 12 Yes Duct system provides conditioned air to an occupiable space for a constant volume,single zone,space-conditioning system. This section does not apply to this project. m v <br /> s For lecture halls with fixed seating,the expected number of occupants shall be shall be determined in accordance with the California Building Code. 13 Yes The space conditioning system serves less than 5,000 ft'of conditioned floor area. 0 <br /> 6 120.2 e 3 requires systems serving rooms that are required by§130.1(c) to have lighting occupancy sensing controls to also have occupancy sensing zone controls for ventilation. o N.DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION N <br /> 14 Yes The combined surface area of the ducts in the following locations is more than 25/0 of the total surface area of the entire duct system: O <br /> Examples of spaces which require lighting occupancy sensors include offices 250ft'or smaller,multipurpose rooms less than 1,000ft',classrooms,conference rooms,restrooms,aisles Selections have been made based on information provided in previous tables of this document.If any selection needs to be changed,please explain why in Table EAdditional Remarks. a .to Ln1 <br /> ❑ Outdoors a fop t <br /> and open areas in warehouses,library book stack aisles,corridors,stairwells,parking garages,and loading and unloading zones,unless excepted by 130.1 c. These documents must be provided to the building inspector during construction and can be found online at W r-I f2 <br /> ❑ In a space directly under a roof that has a U-factor greater than the u-factor of the ceiling,or if the roof does not meet the https://www.energy.ea.gov/title24/2019standards/2019 compliance_do cum ents/Nonresidential—Documents/NR Ci/ V <br /> K.TERMINAL BOX CONTROLS requirements of 1140.3(a)1B :or if the roof has fixed vents or openings to the outside/unconditioned spaces <br /> In an unconditioned crawl space <br /> Field Inspector <br /> ❑ Form/Title <br /> This section does not apply to this project. Pass Fail <br /> ❑ In other unconditioned spaces NRGI MCH 01 E Must be submitted for all buildings El ❑ <br /> L. DISTRIBUTION(DUCTWORK and PIPING) 15 The scope of the project includes extending an existing duct system,which is constructed,insulated or sealed with asbestos. <br /> This table is used to show compliance with mandatory pipe insulation requirements found in 120.3 and prescriptive requirements found in§140.4fl)for duct leakage testing. 16 The scope of the project includes an existing duct system that is documented to have been previously sealed as confirmed through field verification DFESSI'ON <br /> and diagnostic testing in accordance with procedures in the Reference Nonresidential Appendix NA2. Q�l 4� <br /> Duct Leakage Sealing. Q (H Cy Fy <br /> 17 Yes Ducts stem shall be sealed in acordance with the California Mechanical Code fie. � F <br /> The answers to the questions below apply to the following duct systems: RTU-1 Duct leakage testing triggered for these systems? Yes y 2y N <br /> The answers to the questions below apply to the following duct systems: RTU-3 Duct leakage testing triggered for these systems? Yes W <br /> 11 No The scope of the project includes only duct systems serving healthcare facilities v rn <br /> 12 Yes Duct system provides conditioned air to an occupiable space for a constant volume,single zone,space-conditioning system. 11 No The scope of the project includes only duct systems serving healthcare facilities J M 4091 M <br /> 12 Yes Duct system provides conditioned air to an occupiable space for a constant volume,single zone,space-conditioning system. * EXP <br /> 13 Yes The space conditioning system serves less than 5,000 ft'of conditioned floor area. <br /> 13 Yes The space conditioning system serves less than 5,000 ft'of conditioned floor area. <br /> 14 Yes The combined surface area of the ducts in the following locations is more than 25%of the total surface area of the entire duct system: 9� <br /> 14 Yes The combined surface area of the ducts in the following locations is more than 25%of the total surface area of the entire duct system:ElCEO <br /> Outdoors F <br /> 11 Outdoors FO CA <br /> Registration Number: Registration Date/Time: Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider:Energysoft <br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2022-05-20 15:36:31 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2022-05-20 15:36:31 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2022-05-20 15:36:31 <br /> Schema Version:rev 20200601 Schema Version:rev 20200601 Schema Version:rev 20200601 <br /> STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA <br /> Mechanical Systems Mechanical Systems Mechanical Systems <br /> NRCC-MCH-E CALIFORNIA ENERGY COMMISSION NRCC-MCH-E CALIFORNIA ENERGY COMMISSION NRCC-MCH-E CALIFORNIA ENERGY COMMISSION <br /> CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE OF COMPLIANCE NRCC-MCH-E <br /> Project Name: DENNY'S REMODEL Report Page: (Page 13 of 15) Project Name: DENNY'S REMODEL Report Page: (Page 14 of 15) Project Name: DENNY'S REMODEL Report Page: (Page 15 of 15) <br /> Project Address: 4747 PACIFIC AVE. Date Prepared: 5/20/2022 Project Address: 4747 PACIFIC AVE. Date Prepared: 5/20/2022 Project Address: 4747 PACIFIC AVE. Date Prepared: 5/20/2022 <br /> O.DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE O.DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE DOCUMENTATION AUTHOR'S DECLARATION STATEMENT <br /> Selections have been made based on information provided in previous tables of this document.if any selection needs to be changed,please explain why in Table EAdditional Remarks. Selections have been made based on information provided in previous tables of this document.If any selection needs to be changed,please explain why in Table EAdditional Remarks. I certify that this Certificate of Compliance documentation is accurate and complete. <br /> These documents must be provided to the building inspector during construction and can be found online at These documents must be provided to the building inspector during construction and can be found online at Documentation Author Name: Documentation Author Signature: <br /> https://www.energy.ca.gov/title2412019standards/2019 compliance documentsINonresidential_DocumentsINRCAI https://www.energy.ca.gov/title24/2019standards/2019_compliance_documents/Nonresidential Documents/NRCA/ David Kang <br /> Systems/Spaces To Be Field Field Inspector Systems/Spaces To Be Field Field Inspector Company: Signature Date: <br /> Form/Title Verified Form/Title Verified CDI 2022-05-20 <br /> Pass Fail Pass Fail <br /> NRCA-MCH-02-A-Outdoor Air must be submitted for all newly installed HVAC units.Note:MCH-02-A can be performed in Trane WSC060H3*(B,E,G,J)A; NRCA-MCH-12-A FDD for Packaged Direct Expansion Units Trane WSC060H3*(B,E,G,J)A; Address: CEA/HERS Certification Identification(if applicable): <br /> conjunction with MCH-07-A Supply Fan VFD Acceptance(if applicable)since testing activities overlap. Trane Trane 16520 Bake Parkeway,Suite 100 M37036 <br /> WSC092H(3,4,W)(G,K,N)A; ❑ ❑ WSC092H(3,4,W)(G,K,N)A; ❑ ❑ City/State/Zip: Phone: <br /> Trane Trane Irvine CA 92618 <br /> WSC092H(3,4,W)(G,K,N)A, WSC092H(3,4^(G,K,N)A; RESPONSIBLE PERSON'S DECLARATION STATEMENT <br /> NRCA-MCH-03-A-Constant Volume Single Zone HVAC NOTE:This form does not automatically move to"Yes'.If Constant Trane WSC060H3*(B,E,G,J)A; I certify the following under penalty of perjury,underthe laws ofthe State of California: <br /> Volume Single Zone HVAC Systems are included in the scope,permit applicant should move this form to"Yes". Trane P. DECLARATION OF REQUIRED CERTIFICATES OF VERIFICATION 1. The information provided on this Certificate of Compliance istrue and correct. <br /> WSC092H(3,4,W}(G,K,N)A; ❑ ❑ 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance(responsible designer) <br /> There are no NRCV forms required for this project. 3. The energyfeatures and performance specifications,materials,components,and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements <br /> Trane of Title 24,Part 1 and Part 6 of the California Code of Regulations. <br /> WSC092H(3,4,W)(G,K,N)A; Q.MANDATORY MEASURES DOCUMENTATION LOCATION 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on otherapplicable compliance documents,worksheets,calculations, <br /> NRCA-MCH-05-A-Air Economizer Controls Trane WSC060H3 (B,E,G,J)A; <br /> plans and specifications submitted to the enforcement agencyfor approval with this building permit application. <br /> Trane This table i5 used to indicate where mandatary measures are documented in the plan Set or Construction documentation. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s)issued for the building,and made available tothe enforcement agencyfor all applicable <br /> inspections.I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. <br /> WSC092H(3,4,W}(G,K,N)A; ❑ ❑ 01 02 Responsible Designer Name: Responsible Designer Signature: <br /> Trane Compliance with Mandatory Measures documented through MCH Yes David Kang <br /> WSC092H(3,4,W)(G,K,N)A; Mandatory Measures Note Block M-Sheets Company: Date Signed: <br /> NRCA-MCH-06-A Demand Control Ventilation Systems must be submitted for all systems required to employ demand Trane CDI 2022-05-20 <br /> controlled ventilation(refer to§120.1(c)3)can vary outside ventilation flow rates based on maintaining interior carbon WSC092H(3,4,W)(G,K,N)A; ❑ ❑ Address: License: <br /> dioxide(CO2)concentration setpoints. Trane 16520 Bake Parkway,Suite 100 M37036 <br /> WSC092H(3,4,W}(G,K,N)A; City/State/Zip: Phone: <br /> NRCA-MCH-11-A Automatic Demand Shed Controls Trane WSC060H3*(B,E,G,J)A; Irvine CA 92618 J N <br /> Trane CSI <br /> WSC092H(3,4,W)(G,K,N)A, ❑ ❑ W M <br /> Trane Q Q <br /> WSC092H(3,4,W)(G,K,N)A; <br /> 0 0� <br /> 0 <br /> WLL <br /> Registration Number: Registration Date/Time: Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider:Energysoft Registration Number: Registration Date/Time: Registration Provider:Energysoft W J <br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2022-05-20 15:36:31 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2022-05-20 15:36:31 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2022-05-20 15:36:31 < Q <br /> Schema Version:rev 20200601 Schema Version:rev 20200601 Schema Version:rev 20200601 C ) U <br /> W L.L Z <br /> v0 <br /> Z QY <br /> � U <br /> Zlzt <br /> 0 <br /> W � � <br /> D <br /> Z <br /> 0 <br /> W <br /> <1 U') <br /> DATE: SCALE: <br /> 5/09/2022 <br /> SHEET TITLE: <br /> MECHANICAL <br /> TITLE 24 <br /> TM01 <br /> PLOT DATE: 5/20/2022 3:39:28 PM <br />