My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2300 - Underground Storage Tank Program
>
PR0231094
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 9:41:49 AM
Creation date
2/24/2023 10:52:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231094
PE
2361
FACILITY_ID
FA0003632
FACILITY_NAME
AJS MINI MART INC
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
APN
07935016
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Department <br />Underground Storage Tank Program Inspection Report <br />Date: <br />March 08, 2023 <br /> Facility Address: <br /> 7906 N EL DORADO ST, STOCKTON <br /> Facility Name: <br /> AJS MINI MART INC <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />RemarksItem # <br /> 208 CCR 2716(a-e) Failure to comply with the designated operator inspection requirements. <br />OBSERVATION: The designated operator failed to check and note the correct test dates for the overfill prevention <br />and secondary containment tests on the designated operator inspection reports. <br />-The correct dates for the secondary containment test are 9/12/2019 and 9/14/2022. <br />-The correct date for the overfill prevention test is 3/21/2022. <br />REGULATION GUIDANCE: During the inspection, the designated operator shall check that all required testing and <br />maintenance for the UST system have been completed and document the dates they were done. <br />CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br />the required information on the reports. <br />This is a repeat violation, Class II. <br /> 209 CCR 2715(c)(3), 2715(c)(4) Failure to maintain a copy of the "Facility Employee Training Certificate" on-site. <br />OBSERVATION: The Facility Employee Training Certificate dated 8/18/2022 is missing the facility's CERS ID, a <br />current expiration date for the designated operator, and correct initial training dates. <br />REGULATION GUIDANCE: All site employees must be trained prior to taking responsibility as a facility employee if <br />after October 1, 2018, or within 30 days of hire if prior to October 1, 2018. The Facility Employee Training <br />Certificate shall contain accurate information for all employees trained. <br />CORRECTIVE ACTION: Update the Facility Employee Training Certificate to contain the accurate information and <br />submit a copy of the updated form to the EHD. <br />This is a Class II violation. <br /> 306 HSC 25291(e) Failure to remove, analyze, and properly dispose of water in secondary containment (pre-Jul 2003). <br />OBSERVATION: Liquid was observed in the 87-1 STP sump, UDC 1/2 and 5/6. <br />REGULATION GUIDANCE: If water could enter into the secondary containment by precipitation or infiltration, it <br />must be removed and disposed of properly. <br />CORRECTIVE ACTION: The service technician removed approximately 1/2 gallon of liquid from the sumps. <br />Ensure that all sumps and annular spaces are maintained free of liquid. <br />This is a repeat violation, Class II. <br />Overall Inspection Comments: <br />Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br />documenting the corrective actions that have been or will be taken for each violation, and any supporting <br />paperwork, by 4/7/2023. <br />To minimize person to person contact EHD is choosing to write the name of person receiving the report instead <br />of having them sign. Starting September 1, 2018, all in-office CERS help will be provided at EHD hourly rate <br />FA0003632 PR0231094 SC001 03/08/2023 <br />EHD 23-01 Rev. 12/06/2021 Underground Storage Tank Program OIRPage 6 of 7 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD
The URL can be used to link to this page
Your browser does not support the video tag.