Laserfiche WebLink
UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION <br /> UST Monitoring Site Plan <br /> Site Address: Pilot Flying J — 15100 Thornton Rd, Lodi CA 95242 <br /> LEGEND <br /> D=Dispenser <br /> P-Monitoring Control Panel <br /> 3-Sensor <br /> STP-Turhine Sump <br /> F=Fill Bucket <br /> V_'vapor Bucket <br /> A=Annular Sensor <br /> trt=Autom atic Tank Gage <br /> TS=Transition Sump <br /> Las L=Line Leak DeferTD1- <br /> P=Line Leak,D <br /> y L 'dent Lines= <br /> ^3' Vapor Lines= <br /> �y tae CRS=C lean Air Seperator <br /> ent Lines <br /> ties L 1=E nergency Shut Of Switch <br /> CEF! <br /> ® IPV I =Overfill.Alarm <br /> 'J <br /> LM .A/`._q J Exampfe STPISIL=7vrbiaei Sensor/Un, <br /> Leak Detctor <br /> ,�8. TSiS <br /> a <br /> izs <br /> Lal <br /> 2 <br /> las <br /> L L!G <br /> ° <br /> TafS� L'c <br /> o <br /> SM <br /> o Q o <br /> DEF <br /> ---- - _ � <br /> M tE a a n <br /> T U �G <br /> TS EI� N <br /> o 0 o I <br /> 7 <br /> a <br /> 0.d <br /> F <br /> r� <br /> I <br /> BLlildlyd <br /> L=_jr— I ev21C Lta. <br /> a� <br /> LSA <br /> t <br /> P, — I Lt2 <br /> Date map was drawn:T5�1 15 l 2314 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping- Clearly identify locations <br /> of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular spaces, <br /> sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br /> detectors; and intank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan <br /> was prepared. <br /> Page 5 of <br />