Laserfiche WebLink
Railyard Clean-up Plan <br />Stockton Terminal & Eastern Railroad 1300 North Gertrude Avenue Stockton, CA 95215 <br />July 23, 2022 <br />Page 3 of 3 <br />b. Soil extraction will be addressed on a zone-grid-by-zone-grid basis. If <br />material removal is inefficient in removing all contamination, soil extraction <br />will be performed, removing approximately 3" deep crisscross <br />contamination. Extracted soil will be considered ACCM for debris disposal <br />purposes. <br />6. Final Clearance <br />After the zone-grid cleaning, the owner's environmental representative will <br />perform another visual inspection. After the final visual inspection, the <br />environmental representative will deem the area cleared of bulk asbestos <br />contamination and clear the area for any further treatment or handling. <br />Pictures of the areas will be taken, all grid markers removed, and a final <br />letter submitted to the owner for their records. <br />7. Post Clearance Treatment <br />a. For zone 2, areas, will have clean road base, and asphalt will be applied to <br />areas designated by the railyard environmental department. <br />Submitted by: sbeStos c <br />Michael J. Lee <br />DOSII# (16-10.17 <br />Michael J. Lee <br />Certified Asbestos Consultant <br />DOSH# 06-4047 <br />Registered Environmental Property Assessor <br />REPA# 716352750 <br />pi„,P81622 <br />-ec of