My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
717
>
2300 - Underground Storage Tank Program
>
PR0522448
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2024 3:45:10 PM
Creation date
3/8/2023 9:15:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0522448
PE
2371
FACILITY_ID
FA0015274
FACILITY_NAME
KESAR PETROLEUM INC
STREET_NUMBER
717
Direction
W
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16314045
CURRENT_STATUS
01
SITE_LOCATION
717 W EIGHTH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O n Q I VI I N Environmental Health Department <br /> - COU Nā TY <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD ) <br /> 1 . Site map enclosed ? YES [ I NO [ ] <br /> 2 . Submit copies of ICC Service Technician and /or Installer' s certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced . Ensure a copy of <br /> the "Site Health and Safety Plan ā is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and /or replacements . If repairing a component , describe <br /> how this will be done . ( If adding piping , UDC ' s , or other UST equipment, or performing tank top upgrade , <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review ) : <br /> FULL SOW ATTACHED WITH PACKET <br /> 4 . List of equipment to be used (Attach manufacturer' s specification sheets showing third - party approval ) : <br /> Gilbarco Encore 700s Dispensers <br /> Bravo Conversion Frames <br /> 5 , Decontamination Procedures : <br /> a . Will piping be decontaminated prior to removal ? YES [ ] NO [ ] <br /> b . Identify contractor performing decontamination : <br /> Name Phone ( ) <br /> Address City Zip <br /> 3of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.