My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
2300 - Underground Storage Tank Program
>
PR0543446
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 3:10:07 PM
Creation date
3/8/2023 4:47:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0543446
PE
2351
FACILITY_ID
FA0024656
FACILITY_NAME
7-ELEVEN #38153
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
121 S CENTER ST
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7150-TOOL PROCIAWR1E MOW STEP ttlA: TIGHTEWTHF-71 SO•TOOL <br /> FOR 71 SO-TOOLC,SEE PAGE 9 Use the three view holes to ensure that the tool seats <br /> FOR 71SO-100LCT,SU PAGE 18 out flat against the top of the i6let bAw. To prevent <br /> vertical movewnt of the tool during ddtling.hand <br /> Now, 71 SO-TOOL can wdyr be used with tastable tighten al three kr►obi even ly to the upper drop tube <br /> overfdi valves If modified as shown beloow. A 2' see Flgtrre 1 oA. <br /> rriglgr sit must ba addtd to accommodate cast lug- <br /> SM- SM 11A: PREPARE DMILL AND Kilt <br /> Add 2"wide Confirm that the stop on the 3116'ddll bit supplied <br /> slat use d with the 71SO-TOOL is in the correct positron before <br /> drilling The stop is famryr installed at a distance be <br /> testable valves <br /> tween V to 2-1/1 b"from the tip with the 71 SO-TOOL if <br /> the stop is not at the correct position it must be Fixed <br /> before drilling. <br /> CAUT1016 6f the drill stop is not in the proper kora- <br /> k ` tion failure of a pressure decay leak test may resuh. <br /> 1• <br /> 71SO-TOOL Mori fications For Testable Inlet <br /> STEP 9& INSERT 715O-TOOL OilP3t INLET TU RE <br /> To install the 7150-TOOL(sold separately)over the inlet <br /> tubp_first loosen all three knobs,w the tool can pass Tip to stop dlmerswomn must be <br /> freely aver the inlet tube flange. Align the slot on the 2°to 2-1116'. <br /> tool Mth key on the)nlet tube And ir*M Mt tool <br /> down. See Flgwm 9A. r+grrge 1 fA <br /> L005M Ulr -UM STEP 17A: DRILL NOW <br /> Toc�4W bNAM VWM holes tighten With the inlet tube and 71 SAO-TOOL In place,carefully <br /> r— krvubs drill a 3/16'diameter hose in the upper tube±using the <br /> eve* drill bushing in the knob as a guide. The drill step is po- <br /> _� si tioned so it will bottom out again st the knob after the <br /> i Nt t,as dulled through the upper drop tube- If the stop <br /> is posttloned wrong either rv.)hole will be drilled,or a <br /> thiough We could potent W*be drilled through the <br /> 1 iniet tube. If no hole is drilled re Turn to step 1 to and <br /> Nk <br /> check the stop dimension_ If a hole is drilled through <br /> the inlet tube or into the screw We the assembly is riot <br /> Igiet salvageable, grill(2)more hu4s in the two remaining <br /> rule knobs. <br /> 1 <br /> NO thru upper <br /> Figuroa6A rfgurgr tour rube4wly <br /> Figure 12A <br /> R <br />
The URL can be used to link to this page
Your browser does not support the video tag.