My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
2300 - Underground Storage Tank Program
>
PR0543446
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 3:10:07 PM
Creation date
3/8/2023 4:47:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0543446
PE
2351
FACILITY_ID
FA0024656
FACILITY_NAME
7-ELEVEN #38153
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
121 S CENTER ST
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71so-tOOLCT PR(KEDUftEBELOW, -�—r <br /> FOR 71 50-TOOfL,SEE PAGE S 71 S"OOLCT <br /> i <br /> FOR 7754�'001.�,SEE PAGE 9 <br /> STEP W- INSERT 71 SO-TOOLCT OVER MILU TUBE <br /> To insWI the 71 SD-TOOLCT(sold sepd rarely)ower the <br /> 'refer tvbr,first loosen The thumb saes,so the tool Iran <br /> pass freely aver the I Net tube flange. Align the slot on <br /> the tool with the key on the In let tube and insert the <br /> tool down. SM Figuve K. 7fp to stop dirnensloe rnwt <br /> be 1-31160 to 1-1/4' <br /> Loose" Fivin 17C <br /> thumb Hanb tighten STEP 12C. DFULL HODS <br /> screws thumb Slot thumb Screws With the inlet tube and 11 S&TOOLCT in place,careNIfy <br /> _ - drill a 3/16'diameter hole In the upper tube using the <br /> i•{' r: i''- - We in the 71 SO-TOM-CT as a guide. The drill stop is <br /> '. { ,' . . i postvantd so it will bottom out against the toot after <br /> d vJI the bit has dolled through the upper drop tube, If the <br /> stop is posi coned wrong eYthec no hole will be dril leaf, <br /> or a through horse could potentially be drNled through <br /> the in*tom. If no hole is d ri fled return to step 11 C <br /> and check the stop dimension. If a hole is drilled <br /> through the 7ntiel lube or'into the suety hot—the assem <br /> bly is not salvageable. Drill(2)mote holes in ttte two <br /> inlet remaining guide holes. <br /> Tube 1 <br /> Key <br /> v'" r <br /> Fat ore OC Figure i OC ' <br /> STEP W—, TIGHFMN THE 71SO-TOOLCT �V <br /> Insure that the tool sena flat against the tap of the inlet _) <br /> tube. To prevent vertical movenfnt of rhe tool durir,y 012*Frimo WNW UAW Qr*, <br /> drilling,hand tighten tfie thumb Screws against the up- <br /> per drop tube. See Figute I X <br /> STEP 7 1G PREPARE DRILL AND MY <br /> Confirm that the strop an the 3116"drill bit supplied FiFum ix <br /> wi0b"71SO-TOULCI: i5 in ihecorrect posh;osi before <br /> drifting. The stop Is factory frnstalled ala distance Ix- <br /> tween 1-3/16'to 1-1/4"tram the tip with the 71 SO- <br /> TOQLCT. If the stop is not at the correct position n must <br /> be fixed before drilling. <br /> CAU710Nt if the drUI stop is not in lin proper lues. <br /> do n failure of a pressure decay leak test may rasullt, <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.