Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br />been addressed for TRACY 76 as of May 08, 2023. <br />Open violations from March 23, 2023 inspection <br />❑ This violation was corrected <br />❑ Supporting documents included <br />❑ This violation will be corrected by (date): <br />Describe actions taken or will be taken to correct violation: <br />Violation #208 -Failure to comply with the designated operator inspection requirements. <br />1) OBSERVATIOI�t Designated operator reports were not signed within the required time frame. <br />-All DO visual inspection reports were not signed and dated by the owner/operator <br />REGULATORY GUIDANCE Within 48 hours of the completion of the designated UST operator visual inspection, <br />the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 72 <br />hours of being provided a signed copy of the report, the owner or operator shall provide a description of each <br />corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br />issues. <br />CORRECTIVE ACTION: Ensure all designated operator inspection reports are completed and signed within the <br />required time frame in the future. <br />2) OBSERVATIOI�t The designated operator failed to check and note all required items on the visual inspection <br />reports. The incorrect and missing information included the following from the inspection reports: <br />-DO visual inspection reports did not include owner/operator name, signature and date <br />-In section V the owner/operator failed to provide explanation of follow-up actions that will be taken for the <br />statements provided by the DO in section III. <br />REGULATION GUIDANCE: During the visual inspection, the designated operator shall check that all required <br />testing and maintenance for the UST system have been completed and shall check all required items on the report. <br />CORRECTIVE ACTION: Ensure that designated operators performing visual inspections at this facility are including <br />all of the required information on the reports. <br />❑ This violation was corrected <br />❑ Supporting documents included <br />❑ This violation will be corrected by (date): <br />Describe actions taken or will be taken to correct violation: <br />Page 4 of 5 <br />