Laserfiche WebLink
<br />Underground Storage Tank <br />Secondary Containment Testing Report Form <br />All tests marked “Fail” and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 5 of 5 <br /> <br />FGS Red Thd.=Fiberglass Systems Red Thread. PS=Piping Sump. <br />Western FG=Western Fiberglass. BP=Bottom Penetrations. <br /> <br />Note: Tank #2 Super 91 and Tank #3 Diesel is a 12K two compartment. Tank #1 is designated for <br />6K Super 91 Octane Gasoline. Tank #3 is designated for 6K Diesel. Tank #2 and Tank #3 have a <br />common Tank Secondary Containment. <br /> <br />Note: Replaced Test Boot on Super 91 Secondary Pipe at Piping Sump, prior to testing. <br /> <br /> <br /> <br /> <br /> <br />9. COMMENTS