My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2115
>
2300 - Underground Storage Tank Program
>
PR0526335
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2023 11:32:09 AM
Creation date
3/15/2023 8:38:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0526335
PE
2351
FACILITY_ID
FA0017819
FACILITY_NAME
CAGASOLINE INC
STREET_NUMBER
2115
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
2115 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Submit minimum of 3 sets of plans & applications as originals will be retainedM"VjTVNMENTAL HEALTH <br />1, Site map enclosed? YES [ ] NO NPERMIT/SERVICES <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br />certificates for each person installing or testing any component that is repaired or replaced. Ensure a copy of <br />the "Site Health and Safety Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be comple#ed. List components to be repaired or replaced and attach a <br />diagram drawn to scale showing location of repairs and/or replacements. If repairing a component, describe <br />how this will be done, (If addin piping, UDC's, or other UST equipment, or performing tank top upgrade, <br />use the UST {nstallation Application pages 4-8 as necessary for a timely plan review): <br />replace drop tubes in each tank with OPW 71 SO Drop Tubes <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />0 P 71S0 -410C <br />5. Decontamination Procedures: <br />a. Will piping be decontaminated prior to removal? <br />b. Identify contractor performing decontamination: <br />Name <br />Address <br />3of6 <br />YES [ ] NO [ ] <br />Phone L.__._) <br />City Zip <br />
The URL can be used to link to this page
Your browser does not support the video tag.