Laserfiche WebLink
The CARB-certed OPW 71 SO <br />vapor -tight Overfill Prevention Valve <br />is designed to prevent the overfill of <br />underground storage tanks by providing <br />a positive shut-off of product delivery. <br />The shut-off valve is an integral part of <br />the drop tube used for gravity filling. <br />The OPW 71 SO allows easy installation <br />(without breaking concrete) and requires <br />no special manholes. <br />The OPW 71 SO is a vapor -tight two- <br />stage shut-off valve. When the liquid <br />level rises to about 95% of tank <br />capacity, the valve mechanism is <br />released, closing automatically with <br />the flow. This reduces the flow rate to <br />approximately 5 gpm through a bypass <br />valve. The operator may then stop the <br />filling process and disconnect and drain <br />the delivery hose, As long as the liquid <br />exceeds the 95% level, the valve will <br />close automatically each time delivery <br />is attempted. <br />If the delivery <br />is not stopped and the <br />liquid rises to about 98% of tank <br />capacity, the bypass valve closes <br />completely. No additional liquid can flow <br />into the tank until the level drops below <br />a reset point. <br />NOTE: The 71 SO Overfill Prevention <br />Valve can be adjusted to shutoff at any <br />desired tank capacity. Please contact the <br />Authority Having Jurisdiction (AHI) and <br />review local, state, and national codes to <br />determine the regulatory requirements <br />governing shut-off capacity in your <br />region, as well as take into account <br />other considerations such as extreme <br />tank tilt. In all cases, the upper tube <br />must protrude into the tank at least <br />6 1/2" to ensure that the valve can shut <br />off flow into the tank completely before <br />the top of the tank is wetted as per <br />EPA requirements. <br />71 SO Instruction Sheet Order <br />Number: H15524PA <br />listings and C <br />aterials JUN 1 9JUU7 Important <br />g In order to prevent product <br />Valve Body: Cast alumi rt <br />VIRONMENTAL HEALTH spillage nd <br />rage Ta k (UST}, p properly <br />Float: Nitrile rubber, closed cejbRMIT/SERVICES maintained delivery equipment <br />Valve: Aluminum and a proper connection at the <br />tight -fill adaptor are essential. <br />Seals: Viton® Delivery personnel should <br />U er & lower Drop Tube: Aluminum to managed and trained <br />pP p to inspect delivery elbows <br />Plastic parts: Acetal and hoses for damaged and <br />missing parts. They should <br />Hardware: Stainless steel CAalways make certain there <br />is a positive connection <br />Features _ <br />between the adaptor and <br />elbow. If delivery equipment <br />Simple, Easy and Quick °� is not properly maintained, <br />Installation — no excavation or or the elbow is not securely <br />coupled to the adaptor, a <br />special manholes required, serious spill may result when <br />Economical — costs a fraction the OPW 71 SO closes, causing <br />a hazard and environmental <br />of expensive, complicated and contamination, <br />difficult -to -install valves. <br />Furnished Complete — supplied 4 NOTE: The OPW 71 SO is <br />with new upper and lower drop tubes, designed for use on tight-flll <br />gravity drop applications only, <br />mounting hardware and thorough Do not use for pressure <br />instructions for quick job site time. fill applications. <br />Completely Automatic Operation <br />— no prechecks to perform, no resets <br />and no overrides to be broken <br />or abused. <br />No Pressurization of the Tank — <br />operates directly from liquid level. <br />Retrofits Directly —for both new <br />and existing tanks with 4" fill risers, <br />Quick Drain Feature — <br />automatically drains hose when head <br />pressure is relieved. <br />Will Accept a Dipstick Best Flow Rate in The Industry* <br />for Gauging * OPW Test Lab results <br />Advantages of Overfill Prevention <br />Compared to Overfill Warning Systems: <br />Completely Automatic <br />faster fill times and reducing <br />Operation —does not rely on th <br />e <br />alertness or speed of response of the <br />delivery attendant for certainty of <br />overfill prevention. <br />Keeps the Top of UST "Dry," <br />per EPA Requirements — <br />eliminating possible leaks at loose <br />bung fittings and the need for <br />double containment on vent lines. <br />Does Not Rely on Pressure in <br />the UST to Stop Flow —allowing <br />Al risk <br />sp. <br />Speeds Delivery Operations <br />—product flaws unimpeded into <br />the tank until the hose "kick" that <br />accompanies the valve shut-off <br />provides a clear signal that the <br />liquid has reached the shut-off level. <br />Simple and Inexpensive <br />Installation — in both two-point <br />and coaxial fill applications, no <br />additional excavation, manholes or <br />vent piping are required. <br />