My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2115
>
2300 - Underground Storage Tank Program
>
PR0526335
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2023 11:32:09 AM
Creation date
3/15/2023 8:38:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0526335
PE
2351
FACILITY_ID
FA0017819
FACILITY_NAME
CAGASOLINE INC
STREET_NUMBER
2115
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
2115 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report <br />6. OVERFILL PREVENTION EQUIPMENT DETAILS <br />Tank ID (one OPE per column) <br />T2 DIESEL <br />Are both vent and tank riser piping <br />❑✓ Yes <br />❑Yes <br />❑ Yes <br />❑ Yes <br />secondarily contained? <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />OPE Model <br />FLAPPER OPW 71 SO <br />What is the OPE response when activated? <br />[Z] Shut off <br />E] Shut off <br />❑Shut off <br />❑Shut off <br />(Check all that apply.) <br />Flow <br />Flow <br />Flow <br />Flow <br />❑Restricts <br />❑Restricts <br />[—]Restricts <br />❑Restricts <br />Flow <br />Flow <br />Flow <br />Flow <br />❑ Audible <br />❑ Audible <br />❑ Audible <br />❑ Audible <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />❑ Visual <br />❑ Visual <br />❑ Visual <br />❑ Visual <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />Are flow restrictors installed on vent piping <br />❑ Yes* <br />❑ Yes* <br />❑ Yes* <br />❑ Yes* <br />that may interfere with the OPE operation? <br />❑✓ No <br />❑ No <br />❑ No <br />❑ No <br />At what level in the tank is the OPE set to <br />activate? (Inches from bottom of tank) <br />104.25 <br />What is the percent capacity of the tank at <br />which the OPE activates? <br />93.06% <br />Is the OPE in proper operating condition to <br />✓❑Yes <br />❑Yes <br />❑Yes <br />❑Yes <br />respond when the stored substance <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />reaches the designated regulatory level? <br />7. SUMMARY OF TESTING RESULTS <br />✓❑ Pass <br />❑ Pass <br />❑ Pass <br />❑ Pass <br />OPE Inspection Results <br />❑ Fail <br />❑ Fail <br />❑ Fail <br />❑ Fail <br />8. COMMENTS <br />Describe all results marked "Fail' and each proposed remedy. <br />REMOVED BALL FLOASTS. INSTALLED NEW DROP TUBES. <br />DSL PASSED WITH INSPECTOR PAUL NSO. <br />WILL RETURN TO TEST BOTH REGULAR (EAST & WEST) AND PREMIUM ON 08.21.23 WITH <br />INSPECTOR. <br />REPLACED 87 WEST JACK SCREW KIT - TESTED & PASSED. <br />REPLACED ADAPTORS ON 87 EAST & 91 - TESTED & PASSED. <br />* Mark here if: <br />❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br />Additional copies of this page may be attached. <br />Attach tank chart(s), measurements, calculations, and In -Tank Setup report(s) <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.