Laserfiche WebLink
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />6. TANK SECONDARY CONTAINMENT TEST <br />Test Method Developed by <br />® Manufacturer <br />0 Industry Standard ® Professional Engineer <br />Test Type <br />Pressure <br />Vacuum <br />Pn Hydrostatic <br />Test Equipment Used: 0 to 30" hg Dial Gauge <br />+/- 2% @ Mid Scale <br />Tank ID <br />879-TFUG01 <br />879-TFUD01 <br />Tank Manufacturer <br />Trusco <br />Modern Welding <br />Tank Capacity <br />15,075g <br />5,000g <br />Test Start Time <br />10:35a <br />11:05a <br />Initial Reading <br />10.00" hg <br />7.00" hg <br />Test End Time <br />11:37a <br />12:06p <br />Final Reading <br />10.00" hg <br />7.00" hg <br />Change in Reading <br />0.00" hg <br />0.00" hg <br />Pass/Fail Criteria <br />0.00" hg <br />0.00" hg <br />Tightness Test Results <br />® Pass 17 Fail <br />® Pass ® Fail <br />® Pass ® Fail 0 Pass ® Fail <br />7. PIPE SECONDARY CONTAINMENT TEST <br />Test Method Developed by <br />Q Manufacturer <br />® Industry Standard Professional Engineer <br />Test Type <br />El Pressure <br />Vacuum <br />Hydrostatic <br />Test Equipment Used: 0 to 15psi Dial Gauge +/- 2% @ Mid Scale <br />Pipe Run ID <br />879-TFUG01 <br />879-TFUD01 <br />Pipe Manufacturer <br />Ameron <br />NA <br />Test Start Time <br />10:40a <br />NA <br />Initial Reading <br />5.00psi <br />NA <br />Test End Time <br />11:42a <br />NA <br />Final Reading <br />5.00psi <br />NA <br />Change in Reading <br />0.00psi <br />NA <br />Pass/Fail Criteria <br />0.00psi <br />see comments <br />Tightness Test Results <br />Pass Fail <br />Pass ® Fail <br />® Pass Fail <br />Pass ® Fail <br />Pipe Run ID <br />Pipe Manufacturer <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results <br />® Pass ® Fail <br />r Pass ® Fail <br />® Pass ® Fail <br />® Pass ® Fail <br />Additional copies of this page may be attached. <br />All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 2 of 5 <br />