My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SNEDEKER
>
809C
>
2800 - Aboveground Petroleum Storage Program
>
PR0528437
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2023 4:47:04 PM
Creation date
4/3/2023 8:30:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0528437
PE
2833
FACILITY_ID
FA0018706
FACILITY_NAME
CANARY RENEWABLES CORP
STREET_NUMBER
809C
STREET_NAME
SNEDEKER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
01
SITE_LOCATION
809C SNEDEKER AVE
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
inches). <br />g. ___ On floating roof tanks, when the roof is in the lowest position, check that no more than <br />two feet of tape are exposed at the end of the tape guide. <br />h. ___ Inspect condition of board and legibility of board-type autogages. <br />i. ___ Test freedom of movement of marker and float. <br />C.1.3.4 Shell-Mounted Sample Station <br />a. ___ Inspect sample lines for function of valves and plugging of lines, including drain or <br />return-to-tank line. <br />b. ___ Check circulation pump for leaks and operating problems. <br />c. ___ Test bracing and supports of sample system Lines and equipment. <br />C.1.3.5 Heater (Shell Manway Mounted) <br />a. ___ Inspect condensate drain for presence of oil indicating leakage. <br />C.1.3.6 Mixer <br />a. ___ Inspect for proper mounting flange and support. <br />b. ___ Inspect for leakage. <br />c. ___ Inspect condition of power lines and connections to mixer. <br />C.1.3.7 Swing lines: Winch Operation <br />a. ___ Nonfloating. Raise, then lower the swing line with the winch, and check for cable <br />tightness to confirm that swing line lowered properly. <br />b. ___ Floating. With tank half full or more, lower the swing line, then let out cable and check <br />if swing has pulled cable tight, indicating that the winch is operating properly. <br />c. ___ Indicator. Check that the indicator moves in the proper direction: Floating swingline <br />indicators show a lower level as cable is wound up on the winch. Non-floating swing line <br />indicators show the opposite. <br />C.1.3.8 Swing Lines: External Guide System <br />a. ___ Check for leaks at threaded and flanged joints. <br />C.1.3.9 Swing Lines: Identify Ballast Varying Need <br />a. ___ Check for significant difference in stock specific gravity. <br />C.1.3.10 Swing Lines: Cable Material and Condition <br />a. ___ For non-stainless steel cable, check for corrosion over entire length. <br />b. ___ All cable: check for wear or fraying. <br />C.1.3.11 Swing Lines: Product Sample Comparison <br />a. ___ Check for water or gravity differences that would indicate a leaking swing joint. <br />C.1.3.12 Swing Lines: Target <br />a. ___ Target should indicate direction of swing opening (up or down) and height above <br />bottom where suction will be lost with swing on bottom support. <br />C.1.4 ROOFS
The URL can be used to link to this page
Your browser does not support the video tag.