Laserfiche WebLink
MAY 8, 2023 9:27 AM <br /> TANK DELIVERY DELAY <br /> TANK PRODUCT LABEL <br /> 1 SUPER-1 3 <br /> 2 SUPER-2 3 <br /> 3 REGULAR 3 <br /> 4 DIESEL NO.2 3 <br /> I63AOO <br /> MAY 8, 2023 9:27 AM <br /> LOW LEVEL PUMP THRESHOLD FOR SEQUENTIAL LINE MANIFOLD <br /> TANK PRODUCT LABEL PUMP THRESHOLD <br /> 1 SUPER-1 10.00% <br /> 2 SUPER-2 10.00% <br /> 3 REGULAR 10.00% <br /> 4 DIESEL NO.2 10.00% <br /> I61100 <br /> MAY 8, 2023 9:27 AM <br /> LEAK TEST METHOD <br /> TEST ON DATE : ALL TANK <br /> APR 26, 2020 <br /> START TIME : DISABLED <br /> TEST RATE :0.20 GAL/HR <br /> DURATION : 2 HOURS <br /> TST EARLY STOP:DISABLED <br /> I61300 <br /> MAY 8, 2023 9:27 AM <br /> CSLD PROBABLITY OF DETECTION <br /> I61400 <br /> MAY 8, 2023 9:27 AM <br /> CSLD CLIMATE FACTOR <br />