Laserfiche WebLink
6 <br /> Mr. Greg Basso -2- 4 November 1988 <br /> include monitoring/leak detection and closure requirements <br /> for surface impoundments . These requirements are found in <br /> Articles 5 and 8 of Subchapter 15 and need to be addressed as <br /> part of design, construction and closure plans for the <br /> impoundment. <br /> Therefore, you need to submit the ' engineered design, <br /> construction plans and CQA plan to the Board for approval <br /> prior to impoundment construction in order to comply with <br /> your WDRs. In addition the final impoundment construction <br /> report including CQA results and construction certification <br /> needs to be approved by the Board prior to operation. <br /> If you have any questions on this subject, please call me at <br /> (916) 361- 5732 . <br /> STEVE E. ROSENBAUM <br /> Engineering Geologist <br /> cc: Mr. Frank Dellechaie, Department of Health Services, <br /> Sacramento <br /> Mr. Jesse Adams, California Waste Management Board, <br /> Sacramento <br /> d Mr. Alan Biederman, San Joaquin County Environmental <br /> Health, Stockton <br /> Ms. Carolyn Richardson, California Farm Bureau <br /> Federation, Sacramento <br /> Mr. Dan Maglionico, EBA Associates, Orangevale <br />