My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1984-1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1984-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:12:55 PM
Creation date
4/7/2023 1:44:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1984-1989
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
728
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ea <br />PEcEivE� <br />STATE OF CALIFORNIA—HEALTH AND WELFARE AGENCY E EJIAN, Cionernor <br />DEPARTMENT OF HEALTH SERVICES <br />TOXIC SU13STANCESCONTROL DIVISION <br />NORTHERN CALIFORNIA SECTION <br />4250 POWER INN ROAD <br />SACRAMENTO, CA 93826 <br />(916)739.3143 <br />February 19, 1987 <br />Certified #P707826579 <br />Jack McCollough <br />Beta Associates <br />1365 Vander Way <br />San Jose, CA 95112 <br />Dear Mr. McCollough: <br />WORKPLAN FOR MONITORING WELL ABANDONMENT AND CONSTRUCTION, <br />FORWARD, INC., SAN JOAQUIN COUNTY <br />The Department of Health Services approves the workplan dated <br />January 30, 1987 subject to the following conditions: <br />1. The enclosed comments by Department Geologist Rich McJunkin <br />must be incorporated into and become part of the approved <br />workplan; <br />2. There shall be no deviation from the approved workplan <br />without explicit written approval from the Department; and <br />3. The Department must be provided a proposed construction <br />schedule and notified by telephone two days prior to all <br />well construction. <br />This workplan is Phase I of a 2 Phase closure process. The <br />purpose of a 2 Phase closure is to allow a Phase I <br />hydrogeological characterization before a final Closure Plan is <br />approved. The information gathered from the investigation should <br />be used to draft a comprehensive closure plan that follows <br />California Administrative Code, Title 22 and 40 CFR 264 and <br />document incorporating all needed information and data. The <br />Department should receive this comprehensive Closure Plan by <br />April 10, 1987. <br />�yvrar, <br />
The URL can be used to link to this page
Your browser does not support the video tag.