My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1994-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1994-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2023 2:28:24 PM
Creation date
4/7/2023 2:11:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1994-1999
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
680
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CALIFORNIA REGIONA TER QUALITY CONTROL BOARD Cal/EPA <br /> CENTRAL VALLEY RE ° N <br /> 4 3443 Routier Road,Suite A <br /> Sacramento,CA 95827-3098 <br /> �'rFp OVAL Phone(916)255-3000 - <br /> YS Y^. <br /> FAX(916)255-3015 Pete Wilson,Governor <br /> 28 October 1997 <br /> Ms. Carrie Fisher <br /> Forward Inc. <br /> P. O. Box 6336 <br /> Stockton, CA 95206 <br /> FORWARD LANDFILL,SAN JOA QUIN COUNTY(Case No. 2209) <br /> We have reviewed the Construction Quality Assurance Report(CQA) dated October 1997 prepared by <br /> CH2M Hill for the D97 landfill construction. The report documents the construction of 4.5 acres of <br /> composite liner system in the unit. The base liner consists of a compacted clay liner, geomembrane and <br /> granular drainage blanket. The side wall liner overlies the older Class III D89 unit. The side wall liner <br /> consists of a geosynthetic clay liner, geomembrane and drainage net. <br /> The report describes that the D97 unit was built in compliance with the facility's WDRs, Title 27 <br /> (formerly Chapter 15) and Subtitle D requirements. Based on CH2M Hill's report, supporting design <br /> documents and construction certification,the D97 landfill unit is approved for waste discharge <br /> operations in accordance with the facility's waste discharge requirements. <br /> i <br /> u have any questi ns,please call Steve Rosenbaum at(916) 255-3131. <br /> TOR;J. I O <br /> Senior Engineering Geologist <br /> SER <br /> cc: Mr. Scott Walker, California Integrated Waste Management Board,Permitting and Enforcement <br /> Branch, Sacramento <br /> Mr. Ed Padilla, San Joaquin County Public Health Services,Environmental Health Division, <br /> Stockton <br /> Mr. Serge Terentieff, CH2M Hill, Oakland <br /> Ms. Sangeeta Lewis,Lewis Engineering, San Rafael <br /> (3 Recycled Paper Our mission is to preserve and enhance the quality of California's water resources,and <br /> ensure their proper allocation and efficient use for the benefit of present and future generations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.