My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015041
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
6160
>
2600 - Land Use Program
>
PA-2200130
>
SU0015041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 2:37:03 PM
Creation date
4/12/2023 9:16:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015041
PE
2690
FACILITY_NAME
PA-2200130
STREET_NUMBER
6160
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
21803001
ENTERED_DATE
7/5/2022 12:00:00 AM
SITE_LOCATION
6160 E LATHROP RD
RECEIVED_DATE
4/10/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> & Electric Company" <br /> 11. Cathodic Protection: PG&E pipelines are protected from corrosion with an "Impressed <br /> Current" cathodic protection system. Any proposed facilities, such as metal conduit, pipes, <br /> service lines, ground rods, anodes, wires, etc. that might affect the pipeline cathodic protection <br /> system must be reviewed and approved by PG&E Corrosion Engineering. <br /> 12. Pipeline Marker Signs: PG&E needs to maintain pipeline marker signs for gas <br /> transmission pipelines in order to ensure public awareness of the presence of the pipelines. <br /> With prior written approval from PG&E Pipeline Services, an existing PG&E pipeline marker sign <br /> that is in direct conflict with proposed developments may be temporarily relocated to <br /> accommodate construction work. The pipeline marker must be moved back once construction is <br /> complete. <br /> 13. PG&E is also the provider of distribution facilities throughout many of the areas within <br /> the state of California. Therefore, any plans that impact PG&E's facilities must be reviewed and <br /> approved by PG&E to ensure that no impact occurs which may endanger the safe operation of <br /> its facilities. <br /> PG&E Gas and Electric Facilities Page 4 <br /> Public <br />
The URL can be used to link to this page
Your browser does not support the video tag.