My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2023 11:34:14 AM
Creation date
4/12/2023 4:45:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
CHEVRON STATION #212470/2222
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer IN Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: <br /> Sump/UDC ID 87 STP 91 STP Diesel STP <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:28 10:28 11:31 <br /> Initial Reading 5.4695 5.0201 3.0261 <br /> Test End Time 10:44 10:44 11:46 <br /> Final Reading 5.4692 5.0198 3.0267 <br /> Change in Reading 0.0003 0.0003 0.0006 <br /> Pass all Criteria 0.002 0.002 0.002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID 87 Fill 91 Fill Diesel Fill Vent Box <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:28 10:28 11:31 12:08 <br /> Initial Reading 5.3025 3.6471 3.2135 1.3329 <br /> Test End Time 10:44 10:44 11:46 12:23 <br /> Final Reading 5.3034 3.6471 3.2136 1.3318 <br /> Change in Reading 0.0009 0 0.0001 0.0011 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked"Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.