Laserfiche WebLink
Seismic/Anchoring: <br /> Seismic/dynamic/hydrostatic load calculations provided 'th "Hydrostatic <br /> and Seismic Analysis" page or as Attachment(s) <br /> Seismic/Anchoring findings: The tank as designed and operated, and the <br /> containment area in which it is located are adequat chored and are <br /> seismically sound. Initials: <br /> Leak Test: 92M III <br /> Brief description of leak test, including type of test used, and results of <br /> test:l//:rV-V/ �jvri�BG);'m y f <br /> Integrity testing findings: Based on the above noted integrity test and the <br /> results obtained from tha st, the tank has sufficient integrity for its intended <br /> use. Initials: <br /> Tank Drawing: 19 (g){2}�E}1192(fc)(2)(E)) <br /> N \ <br /> 112" E <br /> e <br /> 36" <br /> 1 <br /> � ID. WTI <br /> Facing 4 S WASTE OIL TANK <br /> N E S W <br /> Provide a drawing of the tank, indicating the dimensions of the tank, locations of <br /> seismic devices, piping, pumps and other ancillary equipment. Circle the <br /> direction facing as seen in the lower left corner of the map. <br /> Tank Diameter: /V,�i <br /> Tank Height: 3S'W ,y 9/&* <br /> Tank Gross Capacity (Volume): <br /> 7-1 <br /> Company NameTank/Tank System identification <br /> ,t�vrNf yrvGk .0Ti�uiC�r Tst,ovk <br />