NE)SECURITY FENCE,TYP. IE)Cf'W.W4L USE ELECT. BP A—,--.ES (N)DEF SHEAR \8
<br /> SUPPLIED BY DIMNFR VALVE
<br /> f� -PJ W/RIGID CONDUIT,
<br /> f
<br /> EXPLOSION-PROOF FITTINGe, (N)DEF DISPENSER ry U u
<br /> O W AND POTTED SEALS,AS RE G. �p55 mry
<br /> WIC PER MNFR R_Q'S,1P. (N)ISLAND CI 0 O u�ry
<br /> i 2 Oimm
<br /> FILL (E)LANDSCAPE,TYP.
<br /> z
<br /> L R
<br /> STABILISER BAR < U T
<br /> _________ 1
<br /> r---------------- BY BWMP O W (W SUMP SENSOR
<br /> 1 a A/Jl(E) DIEP,CONTAINMENT H
<br /> I 5 12 13 1 0 0 ' IN)DBL.WALL SYSTEM IN) 3
<br /> 1 FAP.PIPING, "FLEX CONNECTOR
<br /> I 1 Q SLOPED TO
<br /> _
<br /> \I CONCH,3EGL.TYP.
<br /> BI ING I
<br /> Exl6i. 11 (IN)SUMP ENTRY/ _ —
<br /> 1 T II 1- RMINATION ASSEMBLY_ O �W SIDE INSTALL I TEST ALL EOIIPMENT y
<br /> M PER MNFR.REQUIREMENTS IN
<br /> �1 UNDER DISPENSER CONTAINMENT w F Q u°
<br /> O u
<br /> &MTE SOME EXAGGERATION FOR CLARITY J W O m E u
<br /> 111 9 (E)PAVMG,IT,
<br /> ° t1 S 0 11,1u
<br /> n W WYV m�m "nW
<br /> II 3/4"DIA AI93 GE,BASE ANCHOR TAB
<br /> 1 BB/B8M 3 04/316 8 8) •LIE-ML BY MNFR
<br /> SOIL 11®OS �� 1 MPSON SET-xP • IDTH \g`B
<br /> COO O 1 ADHESIVE ALIGNED
<br /> i //3 8 14 15 16 1 4 W/DEF TANK ANCHOR S MIN. (N)DEF UNIT V
<br /> $ L _________ t San Joaquin County Planning Division LOCATIONS(b-ToTAL)- V
<br /> 3 ------ -,\\ \ 1810 E Hazelton Ave,Stkn CA 95205
<br /> 101E°' i \ ° 4 Proposed site plan approved as shown. Z
<br /> °° O Q1 \\\O \ No changes or modifications may be �� r.F. 6 EMBEo , a
<br /> --- ------- \ made without written approval from th yy IE)SLAB ___
<br /> uar. --- yaK Imo- ---i\ 2 EnE�Bogao \ San Joaq in ounty Planning Division. [ { I, r
<br /> COO O Q By: LOO°KGITUOINAL f 3^c R °
<br /> a Date: •12"O.D,
<br /> \ BAR F 14 EW TIB IWU QE;
<br /> BB'
<br /> w \\ SAN JOAQUIN COUNTY DEEPEN BLAB= - 3^cLR (E,WNDISTUrmED 4 p B
<br /> \ VIRONMENTAL HEALTH DEPARTMEN9T EDGE NATIVE BOIL L L s r =
<br /> D Install DEF tank and pOte dis eF" 1969 E.HAZELTONAVE. t1•MIN s.oNT ENVIRONMENTAL HEALTH
<br /> o with trenching a e ac@ Crete pad ocKTON,CA 95205 DIVISION APPROVAL
<br /> ¢ \\_ (208)469-3420 IS NAT REQUIRED a, a m
<br /> a at(E)car t,Ielln PROPOSAL APPROVED SUBJECTTO: NEW DEF UNIT SLAB D D a d
<br /> . ` o OBTAIN SANITATION PERMIT 2 PROJECT IS LOCATED IN:
<br /> \\\ � �yP'\ SCALE: I'.I (W/SOME EXA fERATICNe)
<br /> APPLI� NT SHALL BE ¢) 0 OBTAIN WELUPMPPERMIT NONE p D CONDITIONS NOTED BELOW Sanitary Dist
<br /> RESPONSIBLE FC&AVINS,TYP. REMARKS UI
<br /> a
<br /> prior to commencing work near the petroleum UDC. V Q n
<br /> DETERMI TNG LOCATION � CalWater Water Dist
<br /> OF ALL P ZOPERTY LINES as%I�M{R DEF TANK DESCRIPTION z �pO0
<br /> ,Lerma Q DATE WOWN23 BY ,eld
<br /> AND ASEM ENTS B�WP+ O p Approval extends on to that which i�how and de SENEGR CONNECTED TOS TA- ILL EE THE FUEL bTSTEY'S VEEDEU/THE �R-ROOT 1.350 0 Q
<br /> Hereon ane dost not audloriae or approve any omRSlon or �u U O M
<br /> lbl R deviation from requirements of state bws ar bcal ordinaRbKs NEW DEP DISPENSER IID.WILL HAVE A STANDARD vEEDER-I OT]08 Q Z Q—
<br /> a LIQUID 8ENSGR CONNECTED TO THE TLS 350 SYSTEM. H O O ZL
<br /> OO ANI AIR/W THE DEF UNIT WILL HAVE NO FILL CONTAINMENT,AS IT 18 DIRECT FILLED INTO 0y Z Q
<br /> ATER UNIT THE TM VIA A 5TANDARD VEEDER-ROOT OVERFILL DEVICE WHICH 0 U'4
<br /> EE) EX ST NG MONITORS THE DEF TANK FILLING,AND IS CAPABLE OF CLOSING THE DEVICE'S m O
<br /> TR STING,TO REMAIN
<br /> FHM. ENHANCED VAPOR FRE HYDRANT RECOVERY VALVE AND bTOPPINla THE FILLII l
<br /> V P L.Y. LM VOLTAGE SECURITY POR THE DEF UNIT IB PRIMARILY LOOKING OF THE SINGLE MAN-DOOR,
<br /> O IN) NEW THE 5UILDMG AND ITS FRAME ARE METAL.
<br /> TYP. ttPIDAL
<br /> kFR TRANSFORMER
<br /> APPLICABLE CODES AND STANDARDS INCLUDE.
<br /> D E F U P G R A D E S I T E P L A N CA IFDR IA&ILDI G GODS(GBG>1011
<br /> CALIFORAIA
<br /> L\1J(my/J CALIFgWIA ELECTRICAL CODE ICEC)3033
<br /> SCALE:I" 10' (USE GF24PHIC SCALE FOR REDUCED PLOTS) CALIFORNIA AIR RESOURCES BOARD(GARB)EXEC ORDER VR-203x Alm
<br /> GARB AF'RiOVED INSTALLATION,OPERATION AND MAIMENANCE MANUAL FOR EO VR-103x u�
<br /> TITLE 23,CALIFORNIA CODE OF�ATION6,CHAPTER 16,UNDERGROINID TANK�CdILATIONS
<br /> SITE PLAN DEVELOPED FROM RE RG DRAWNGS,PARCEL I E WATER RESOURCES CONTROL BOARD--ET F—)0 10 20 40 DATA AND PHOTOGFAPHB.THIS 18 NOT A SURVEY, EQUIRffNT MANUFACTURERS'INSTALLATION REQUIREMENTS
<br /> W
<br /> 4
<br /> n
<br /> ADD NEW DEF NOTES Q
<br /> INSTAL NEW DEF 21K TANK AND I REMOTE DISPENSER e. UNDE RCUNG CONDUITS AND WIRING SHALL HAVE A MINI.F 34"COVER AND COMPLY W/DEC 5148 WHERE REQ'D,-TS ARE BHCWN BCHEMATI.,
<br /> AND MAY BE EXAI ER4TED FOR DRAFTING CLARITY.VARIATIONS DE TO FIELD CONDITIONS FOUND ARE EXPECTED,
<br /> L IE)STORAGE TANKS—T.)TO REMAIN DOUBLE WALL COMPOSITE FlBERGLAB OVER STEEL,BY TR SCO,TYP. YN
<br /> BER FO TRENCH+INSTALL NEW 3"OVER E FIBERGLASS REINFORCED PLASTIC(FRP)PIPING FROM DEF SYSTEM TO(N)DISPENSER SLOPE TO NDC AT 1/e"
<br /> 2, EXIST.DISPENSERS ON IE)WDER DISPENSER GONTAINFENT(UDC)/SHEAR VALVE SYSTEMS,TYPICAL. a PER FOOT,MIN.BACKFILL TRENCHED W/PEA GRAVEL TO LEVEL REOIIRED FOR NEW BLURRY COVER AND PAVING BASE.PROVIDE CONCRETE 4"THICK MIN. �W I!
<br /> OVER PEA GRAvEL.INSTALL NEW COm.DRIVE SLAB,TO MATCH EXIST.SECTION,MIN 6"THK,W/4 BARS AT IB"BOTH WAYS. W O Z b;Jjjl{�
<br /> S. B IEFFEN REMOVE ON DIBP'OBE ALL CONCRETE AND ASPHALT REQUIRED FOR THE NEW PIPMG AND ELECTRICAL TREINCHEB FROM THE NEW UNIT TO THE ISLAND 6> m
<br /> DISPENSER MID CONTROL BUILDING m. NOT USED. W N J Iaf OO
<br /> 4. PROVIDE AND INSTALL 3'X 3'CONCRETE ISLAND WRM FOR WAYHE SELECT SI DEF.(W DEF DISPENSER ON b"RAISED ISLMID,W/IW UNmER DISPENSER 11. IDE AND INSTALL REQUIRED CONDUITS FOR COMMUNICATION AND POILER PROVIDE I EXTRA 3/4 INCH CON QUIT TO DISPENSER UDC,DEF TAW,AND F r
<br /> CONTAINMENT IUDW.PROTECT W/I2)6"EOLLARDB,TO MATCH(E,.PROVIDE(113/4"CCNDUItB FOR NEW DISPENSER(I)POJ¢RCOMMUNICATICNB,(U BPAf�. HOME RAN. F
<br /> w
<br /> 00.
<br /> 3
<br /> W �g9
<br /> F 1 7
<br /> E rc
<br /> LOCATE NEW DEF TANK BYBO FI ON��D CONTROLS,IN fE)BLDG.(CONFIRM LCCAtIONS.) Q. PROGR4H TLS FOR NEW DE PRODUCT AND OVERFILL VALVE. N J
<br /> S. (E)FEL SYSTEM PMIELS,H ITORING ®®®
<br /> 6. TEM GON..DRIVE BLAB.NEW SLAB SHALL BE V MIN THICK CGNO�TE P F,BARS AT 13"OC.BOTH WAYS TOP 1 BOTTOM B. INSTALL PI D-BOX(FLYERS SUPPLIED) W LL- � o
<br /> N
<br /> (TIB 1 W/MIN BOIL COMPACTION OF 95%,MI OvE BLAB D.I THE SIZE OF DEP SKID FRAME PLUG B"DI EACH BIDE(TOTAL WIDTH MIN T'-6")AND B"ON EACH yp
<br /> END(TOTAL LENGTH MIN,MPSO)AND 1"ABOVE EI GRADE.INSTALL SECURITY ANCHORS PER SFA ENGINEERING ANCHORS PER ICENES-1b,MIN(B)R, DIA.AI93 GR K. SETUP NEW DISPENSER WITH FEEING POINTS ADDRESS PROVIDED BT THE PROJECT MANAGER ADD DISPENSER DECALS AS NEEDED. LL 0 d
<br /> CONDIffTE EHALLB1 V BE CAIPABELEN.F PASSNG AEMINIMUMb MCOMPRE BEE STRENGTH NOF 3500 PB AFTER 20 DAYPER ICC EBR-1508.NEW DRIVE BLAB g CALIBRATE AND TEST NEW EQUIPMENT.PERFORM ALL STATE,CITY,MID COUNTY TESTING REQUIREMENTS.COORDINATE WITH ALL AGENCIES FOR UIOR S C[y
<br /> TO BE PERFORMED, CCC
<br /> T. b WCUT,TRENCH AND INSTALL ONE IU NEW 3/4"CONDUIT(LV)AND(I)NEW V C.(HV)FROM DEF SKID/ENCLOSURE UG.TO(111 5-INSTALL NEW CONDUCTORS VIA
<br /> LV I Hv CONDUITS TO BLDG.WIREWAY HV) ((O VIA NEW JNNCTION BOX N-BOX)AT(E)BUILDING WALL,IF IEQUIR I WIRE DEF SYSTEM MONITORING(LV)AND 40A, I6. COORDINATE WITH PROJECT MANAGER(RM)ON SCHEDULING.VERIFY WITH RI FOR TESTING WITH FLYERS ENERGY TECHNICIAN TO INSURE
<br /> PER I—R.REQU REMENTS. 4L REQUIRED SEAL-OFF FITTING5 PER ARTICLE 514 OF THE GEC FOR HASARDO'JB LOCATIONS(IF REQ'D.1.(NOTE- TRANSLATION IS RECORDED ACCURATELY.
<br /> DIESEL EXHAUST FLUID(DEF)IS NOT,ITSELF,A CLASS I LIQUID AND DOES CREATE A CLASS I LOCATION PER ARTICLE 5143 OF THE CEO FOR MOTOR FUEL
<br /> DISPENSING FACILITIES).INSTALL GRO)NDNG I BONDING FOR SYSTEM PER MNFR.RED'S. r. (E)E80,TO REMAIN. DCC 1
<br /> p� OF I SHEET
<br />
|