Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ® Manufacturer N Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ® Vacuum ❑ Hydrostatic <br /> Test Equipment Used: 0-30inHg. 4" Vacuum Gauges w/ 0.05 graduations <br /> Tank ID T-1 87 T-2 Red Diesel T-3 Diesel <br /> Tank Manufacturer Trusco Trusco Trusco <br /> Tank Capacity 12K 10K 10K <br /> Test Start Time 8:00am 8:00am 8:00am <br /> Initial Reading -10hg -10hg -10hg <br /> Test End Time 9:00am 9:00am 9:00am <br /> Final Reading -10hg -10hg -10hg <br /> Change in Reading 0.00 0.00 0.00 <br /> Pass/Fail Criteria No Loss No Loss No Loss No Loss <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ® Manufacturer N Industry Standard ❑ Professional Engineer <br /> Test Type N Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Dual 0-15psi 4" Pressure Gauges w/ 0.05 graduations <br /> Pipe Run ID T-1 87 T-2 Red Diesel T-3 Diesel <br /> Pipe Manufacturer A.O. Smith A.O. Smith A.O. Smith <br /> Test Start Time 9:10am 8:30am 9:10 <br /> Initial Reading 5psi 5psi 5psi <br /> Test End Time 10:10am 9:30am 10:10am <br /> Final Reading 5psi 5psi 4psi <br /> Change in Reading 0.00 0.00 0.00 <br /> Pass/Fail Criteria No Loss No Loss No Loss No Loss <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass M Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria No Loss No Loss No Loss No Loss <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />