My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231765
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 4:07:03 PM
Creation date
4/24/2023 9:27:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231765
PE
2361
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B2000 RETROFIT KIT °° <br /> oto <br /> co <br /> < <br /> INSTALLATION INSTRUCTIONS ° ,' <br /> A FACTORY-PROVIDED T FOR SEALING PRODUCT AND CONDUIT ENE- <br /> TRS ON LEOAC1(B-2000 SF&A low UDC•S. d V <br /> IT <br /> INCLUDED 1xVS-B-Caul[tube of BlackWlkem116potyurethanesealant B-18-3 Vulkem Seal Z LLU. <br /> 3x FR-ES1-To split FRP clamshell x 2.5'tall Uj <br /> COMPONENTS: 3x FR-IIYE-S-Wo split FRP clamshell clashell x 1.5"tan - WARNING!The barer nut of the ry O <br /> 3x ADHESIVE-EPDXY-RETROFIT-KIT-Brava FRP Epoxy B-18-9fiaino mustnatWoosened withounhe (n LUL <br /> 3x Paas of large gloves 3x Stir slicks anrpresalan donut searety sealed against /Fn z <br /> caavra aua.tecr ra 6x T hose clamps 1x Sheet of sandpaper M boefi areeoosanned holds <br /> much the 810-3 v <br /> 6x 3°hose Gam V <br /> a+.woe Yvmtaur ntorlca Ps .. 5tirtg body may drop down or fait through the <br /> Aftei the shrJlr,n,r�n. <br /> �► I'� Atter clearnnQ all coaaclarees llYanuQHy,use � U <br /> wlkem to shl between n the bales nut and fffi <br /> tiO• �\ togasketen he l the to?cwt secured l the pipe, In U) <br /> ►./ loosen the lower rvl and appry wlkem under <br /> := cc <br /> � �^ . ...r�.. the cwtand generauslybha exposed breads N <br /> �� of he body.Do not dislodge the fat gasket or <br /> �� 't f:. apply wlkem between it and the floor of he <br /> %.PP'` 'flow.Lubricator.can cause it b slip loose <br /> FR-MYE-5 RETROFIT till <br /> a pinchacefghle�d u�ngaeekparo. <br /> V <br /> MYERS HUB(MYE)CONDUIT B-18-3 Compression Fitting -PRODUCT' l <br /> 4AVFITTING For MYE's,clean fYe extodor of he fling -"andsandheepozypafNoloftheslael tooraboutl•outB-18-3 orientation <br /> from its outer diameter.Apply Bravo spo xy to interior of _ The brass secondary line lest plug located <br /> Fft,MYE-6 split FRPaleeve and install over he MYE filing 1 within the body should be at a 90'degree <br /> with clamps.Ensure it is completely encapsulated with no h. _' anglm e from,any flat wall.If it is at any other M <br /> trapped air.Then apply a generous bead of wlkem to the - ague, the citing is not installed comedy N <br /> outside d he FRP sleeve where if contacts the to .Be and/or the gasket is not gal against the four. 0 <br /> sure b at was exposed from sand <br /> re-cost any steel thing f - ; _ N <br /> cleaning.Just above it.where osmmordy anoher pipe - - -- - Whether the gasketisseaWfinnlytoballoor r <br /> protrudes through and a conduit comes through hat pipe. ar not,or if the orientation is incorrect he J <br /> follow the FR-ES1 retrofit directors above to seal hese MAkem sealing mehod outlined below is he Q 0 <br /> two pipes to each other. best way to male a lasting liquid-tight seal. <br /> W a— <br /> BH-1-1/2 VAPOR FITTING 1--i-ting pibtlnq ihu sucmmimy:he <br /> by nut makes this seaL The Brass plug should W <br /> Clem the exterior surfaces of the truing and repeat the rel be removed.H leaks occur turn the by I-- <br /> j <br /> Instructions listed above for the Myers Hub fitti%l is nw.nn PLUG nwVdonut hen loosen them wih WD-40 it Q <br /> —_� common for a vapor shear valve to be threaded directly necessary and raaeu t with weWry grease. <br /> onto his type of feting.If so,hen he F114MYE-5 should Then tighten the rat no more hon 114-12 <br /> apply-but if here is a nipple above,has he FR-ESI may lucre past hand Tight. <br /> also be needed.b is detailed below and shown on he lett. <br /> In the case hem fJs filling was instead used as a conduit DISPENSER Ln <br /> entry,(os shown)fire[install the FR-VS1 to the topmost in 0 <br /> part or the Ihmads and he conduit hat protrudes though. (e)WM VALVE] (e)VAPOR SHEAR VALVE N <br /> (e)SHEAR VALVE I� � <br /> (e)BRAVO SHALLOW BOX "---i N O <br /> -27 Compression Fitting -VAPOR i n If o a <br /> - -- You do not need to worry about the B-27 fitting body --r--�'- _ ♦Y V <br /> dropping dorm or falling trough the bottom d he shallow <br /> U.1 <br /> pan if he vapor lure is threaded into the trop of this 11 g. a "/ r�f 1 '� �^ Q Z <br /> smaller line is passing through il howave,it may drop down .. O <br /> and out so use caution and secure he body above he floor <br /> as you loosen he cwt b test it ,�. C= ty 7 <br /> Ater cleaning ell contact meas thoroughly use wlkem b <br /> seal between the nut and flat gasket and also to the exposed 0 <br /> threads of the body.Do not apply vulkem between the fel <br /> gasket and the floor of he shallow pan or dislodge this <br /> vus.xaw gasket Lubricalion can cause it b slip loose or pinch once �i 4' <br /> fgHaxed causing a leek pant REPAIR ENTRY FIiiU1GS ##��.@ <br /> I 1 " - wY til <br /> FR-ESI RETROFIT f r h <br /> FEF-EBS CONDUIT FITTING " _n fix; <br /> For this Citing,remove the existing boa&clamps.clean fns BELOW DISPENSER <br /> contact surfaces of anyall contmr nanis.abrade the cooed ilr <br /> surfaces of boh pipes and install he FR-E81 split FRP sleeve 7 <br /> centered over both diameters.You can pack he mledor a he EQUIPMENT LIST: <br /> steel coup4er with foarn each hHfwdh Bravo epoxy,an hon bgetheraMsecureor other malenal Erst.Then�`th 1. 2- B2000 BRAVO SHALLOW SHEET <br /> clamps to cure.Bead with vulkem where it contacts he four. PG. 2 <br /> BOX REPAIR FLIT <br />
The URL can be used to link to this page
Your browser does not support the video tag.