My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231765
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 4:07:03 PM
Creation date
4/24/2023 9:27:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231765
PE
2361
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The fittings listed and illustrated here are common examples of what may be installed in your Bravo <br /> B-2000 series shallow steel UDC's. In many cases entry fittings were used for pipe or conduit that they <br /> were not designed for. Read every scenario below as there are valuable tips, warnings and <br /> instructions. Some may apply broadly. Bravo does not make any requirements for which combinations <br /> are acceptable, nor does Bravo specify any heights, elevations or measurements for adjustments. <br /> 01 —Is <br /> FR-ES1 RETROFIT <br /> FEF-EBS CONDUIT FITTING <br /> For this fitting, remove the existing boot & clamps, clean the <br /> contact surfaces of any/all contaminants, abrade the contact <br /> surfaces of both pipes and install the FR-ES1 split FRP sleeve <br /> centered over both diameters. You can pack the interior of the <br /> steel coupler with foam cord or other material first. Then pack <br /> each half with Bravo epoxy, join them together and secure with <br /> clamps to cure. Bead with vulkem where it contacts the floor. <br /> 01 —IN <br /> FR-MYE-5 RETROFIT <br /> MYERS HUB (MYE) CONDUIT <br /> FITTING For MYE's, clean the exterior of the fitting <br /> and sand the epoxy paint off of the steel floor about 1" out <br /> from its outer diameter. Apply Bravo epoxy to interior of <br /> FR-MYE-5 split FRP sleeve and install over the MYE fitting <br /> with clamps. Ensure it is completely encapsulated with no <br /> trapped air. Then apply a generous bead of vulkem to the <br /> outside of the FRP sleeve where it contacts the floor. Be <br /> sure to re-coat any steel that was exposed from sanding / <br /> cleaning. Just above it, where commonly another pipe <br /> protrudes through and a conduit comes through that pipe, <br /> follow the FR-ES1 retrofit directions above to seal these <br /> two pipes to each other. <br /> BH-1 -1/2 VAPOR FITTING <br /> Clean the exterior surfaces of the fitting and repeat the <br /> instructions listed above for the Myers Hub fitting. It is <br /> common for a vapor shear valve to be threaded directly <br /> onto this type of fitting. If so, then the FR-MYE-5 should <br /> apply, but if there is a nipple above, then the FR-ES1 may <br /> also be needed. It is detailed below and shown on the left. <br /> In the case where this fitting was instead used as a conduit <br /> entry, (as shown) first install the FR-ES1 to the top-most <br /> part of the threads and the conduit that protrudes through. <br /> 2 ii-82000-RETROFIT-KIT-14A <br />
The URL can be used to link to this page
Your browser does not support the video tag.