Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ® Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum M Hydrostatic <br /> Test Equipment Used: Triangle Manufacturing 5000w Level System w/ + or— 0.002" <br /> Sump/UDC ID UDC#3-4 UDC#8-9 <br /> Sump Manufacturer Bravo Bravo <br /> Sump Depth (inches) 12" 12" <br /> Sump Bottom to Top of 2.5" Piping 2.5" Piping <br /> Highest Pipe Penetration enters through enters through <br /> (inches) bottom of UDC bottom of UDC <br /> Test Start Time 8:24am 8:24am <br /> Initial Reading 1.4271" 1.5941" <br /> Test End Time 8:39am 8:39am <br /> Final Reading 1.4269" 1.5938" <br /> Change in Reading -0.0002" -0.0003" <br /> Pass/Fail Criteria + or— 0.002" + or— 0.002" <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3of5 <br />