Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9. COMMENTS <br /> Notes: <br /> 1. Permitted repairs made to: <br /> a. T-3 Diesel product at Bravo termination fittings at UDCS with Bravo B-2000 retro fit <br /> kits. <br /> b. UDC#3-4 and #8-9 had repairs made to electrical penetrations with Bravo B-2000 <br /> retro fit kits. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5of5 <br />