Laserfiche WebLink
Environmental Health Department <br />Underground Storage Tank Program Inspection Report <br />Date: <br />May 16, 2023 <br /> Facility Address: <br /> 25651 N HWY 99 , ACAMPO <br /> Facility Name: <br /> SMK CHEVRON <br />Single-Walled Non-Pressurized Piping <br /> 404 □ V □ R □ COSFailure to conduct 0.1 gph test on single-walled gravity piping biennially or post repair (pre-1984)CCR 2643(e), 2661(f) <br />Other Violations <br /> 2010 □ V □ R □ COSUnlisted General violation See below <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />RemarksItem # <br /> 122 CCR 2712(f) Failure to implement corrections and submit written response within 30 days of receiving the report. <br />OBSERVATION: An inspection was last done on 5/4/2022 and an inspection report was issued identifying <br />information to be submitted to bring this site into compliance. This information was required to be submitted by <br />6/3/2022. This information has not been received resulting in a non-compliant status for this facility. <br />REGULATION GUIDANCE: An operator that receives an inspection report shall have 30 days to implement the <br />corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br />all of the recommendations made in the report. The operator shall submit a written response that includes a <br />statement documenting corrective actions taken or proposing corrective actions which will be taken. <br />CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br />submitted and all corrections implemented within 30 days of receiving an inspection report. <br />This is a Class II violation. <br />Overall Inspection Comments: <br />An inspection report was provided to the facility operator on the day of inspection. The report was amended <br />and replaces the initial report. <br />Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br />documenting the corrective actions that have been or will be taken for each violation, and any supporting <br />paperwork, within 30 days of receiving the amended inspection report. <br />AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING <br />THIS FACILITY BACK INTO COMPLIANCE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received by: Inspector Phone: <br /> KRISTINA SAETERN, EH Specialist <br /> Inspector:May 16, 2023 Date: <br />Printed Name and Title: <br />Emailed to Tony Singh, Officer <br />(209) 616-3045 <br />FA0003835 PR0231628 SC001 05/16/2023 <br />EHD 23-01 Rev. 12/06/2021 Underground Storage Tank Program OIRPage 4 of 4 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD