My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 11:19:01 AM
Creation date
4/26/2023 9:51:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
21721070
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> UST Monitoring Plan <br /> site Address: 460 W. CENTER ST. <br /> OFFICE <br /> BLDG <br /> FUEL POLISHER LINE <br /> STIMATED 7;7D <br /> LOCATIONLISHER LINE <br /> H5: uel Polisher <br /> p RETURN LINE <br /> ESTIMATED LOCATION <br /> PRODUC LINE <br /> ESTIMATED LOCATION. H3:Piping Sump <br /> H4:Piping Vault Piping Sum Sensor <br /> Sensor <br /> 0 <br /> DIESEL <br /> TANK <br /> T •TANK LEVEL PR BE 6000 <br /> TANKVENTLINE FlII Sump *19) 0 <br /> H2:FlII Sump <br /> o ESTI TED LOCATION Sensor <br /> oS <br /> Da Tank CATHO OX H7 :Annular Space <br /> D I E S E L Sensor <br /> ENERATO <br /> Spill <br /> Monitoring System Container <br /> Control Panel <br /> VEEDER ROOTTLS-M <br /> Date map was drawn: <br /> Instmetio s <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification. On your plan, show the general layout of the tanks and piping. <br /> Clearly identify locations of the following equipment, if installed: monitoring system control panel; sensor <br /> monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; <br /> mechanical or electronic line leak detectors; and in-tank liquid level probes (if used for leak detection) . In the <br /> space provided, note the date this plan was prepared <br />
The URL can be used to link to this page
Your browser does not support the video tag.