Laserfiche WebLink
iota CGRS <br />ENHANCED LEAK DETECTION SOLLTIONG OELIVrRF=D <br />Secondary Flow Communication Test Certification <br />Location: CGRS Project No : 61-26627 <br />Arch Rd Travel Plaza Test Date: October 18, 2023 <br />4850 S. 99/E. Frontage Rd. CGRS Techs: Sergio L. Nunez <br />Stockton, CA 95215 <br />CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed <br />throughout the secondary piping components listed below. <br />Piping Secondary Communication Confirmation <br />COMPONENTS <br />RESULTS <br />87 PL <br />PASS <br />91 PL <br />PASS <br />DSL PL <br />PASS <br />87 Vent <br />PASS <br />91 Vent <br />PASS <br />DSL Vent <br />PASS <br />VR <br />PASS <br />IOTA Tech Signature: <br />Sergio L. Munez <br />Reviewed by: <br />Chris Murphy <br />CA Tank Tester #06-1727 <br />r of CA Services <br />10/18/2023 <br />Date <br />10/19/2023 <br />Date <br />