My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4850
>
2300 - Underground Storage Tank Program
>
PR0548363
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:39:15 PM
Creation date
5/18/2023 8:35:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0548363
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0027616
FACILITY_NAME
G & G INC
STREET_NUMBER
4850
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17948012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4850 S STATE ROUTE 99 STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CGRS <br />SOLUTIONS DELIVERED <br />0 <br />iota <br />ENHANCED LEAK DETECTION <br />Subject: Work Plan for IOTA v00519 and iotaVisionT"° Pre and Final ELD Testing Services <br />To Whom It May Concern: <br />CGRS is pleased to present you with this work plan for pre and final enhanced leak detection (ELD) testing services for your <br />project at the above referenced location. CGRS will utilize the iota VaporTite V005 and iotaVisionTm L005 (LG 113) to <br />perform the final ELD post installation test as required by the State of California. These test methods have been evaluated <br />by the California State Water Resource Control Board and determined to meet the performance requirements for post <br />installation ELD testing (see LG 162-3 attached). <br />O Pre Testing will be performed on the primary containment portion of the fueling system with the IOTA test method <br />while the tank top and product, vent and vapor piping is exposed, prior to backfilling. Any problems encountered <br />during the pre -testing will be addressed by the installation contractor and retested by CGRS the testing crew. <br />O Final ELD testing will be performed on all primary fuel containment system components once the fueling system <br />has been completed (everything below grade surface) backfilled, concrete poured, and the system is essentially <br />ready to receive fuel. This will provide the installation contractor, general contractor, design engineer, site owner <br />and operator with third party certification that the system is "vapor tight" before it ever receives fuel. <br />O Final testing with iotaVisionT" will be performed on all brine filled underground storage tanks and their <br />compartments thus ensuring that brine is not observed in the primary containment. <br />CGRS holds a current California Contractors License with a Hazardous Materials endorsement. All final ELD testing will be <br />performed by a certified IOTA technician holding a current California Tank Tester license. <br />If you have any questions regarding any aspect of this work plan, please don't hesitate to contact me at 1-800-288-2657. <br />Sincerely, <br />Chris Murphy <br />Director of CA Operations <br />CGRS, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.