My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4850
>
2300 - Underground Storage Tank Program
>
PR0548363
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:39:15 PM
Creation date
5/18/2023 8:35:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0548363
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0027616
FACILITY_NAME
G & G INC
STREET_NUMBER
4850
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17948012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4850 S STATE ROUTE 99 STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rivera, Stacy [EHD] <br />From: Engineering Division <engineeringdivision@lcservices.com> <br />Sent: Tuesday, December 6, 2022 11:15 AM <br />To: Rivera, Stacy [EHD] <br />Subject: RE: SR0085819 - 4850 S. Hwy 99, Stockton <br />Attachments: Arch Rd 12_6_22-m i n. pdf <br />See Plan Corrections below. <br />James Otto <br />LC Services - Engineering Division <br />3887 N. Valentine Ave. <br />Fresno, Ca. 93722 <br />Phone: (559)444-1730 <br />Email: engineeringdivision@lcservices.com <br />Website: www.Icservices.com <br />From: Rivera, Stacy [EHD] <br />Sent: Tuesday, December 6, 2022 10:55 AM <br />To: Engineering Division <br />Subject: SR0085819 - 4850 S. Hwy 99, Stockton <br />Hi James, <br />I have completed the review of the underground storage tank installation application for 4850 S. Hwy 99, Stockton <br />(SR0085819). The following items are needed. <br />1. Provide current contractor's training certifications for installation of all proposed UST equipment/components. <br />2. The cut sheet for the 7,500/7,500 gallon split tank only shows two tank collars, the same number as the single <br />compartment 15,000 gallon tank. To clarify, the turbine and spill containers will be inside the same sump on the <br />diesel and 91 tank, but inside separate sumps on the 87 tank? This is correct. <br />3. Drawings do not include a vent sump. The comments indicate updated pages C1, S1, and F1, but these were not <br />included in the attachments. Added, revised plans attached. <br />4. Page T4 includes a cut sheet for a 12,000 gallon tank. No mention of a 12,000 gallon tank is made in the rest of <br />the submittal. 12k Tank is an AST <br />5. Vacuum zones on page M1 indicate there will be separate diesel and 91 turbine and fill sumps. This is not <br />consistent with the cut sheet (page T2) and page T3. Corrected the number of sumps on M1 to reflect tanks. <br />6. Vacuum zones on page M1 indicate vacuum being drawn from the both the diesel and 91 vent lines using the <br />tank from different points. This would cause vacuum to be drawn in two different directions possibly interfering <br />with the ability of the liquid sensor to detect a leak at the earliest opportunity. Corrected Drawing. Diesel and <br />Premium Vent lines Monitored individually. <br />
The URL can be used to link to this page
Your browser does not support the video tag.