Laserfiche WebLink
Rivera, Stacy [EHD] <br />From: Engineering Division <engineeringdivision@lcservices.com> <br />Sent: Tuesday, December 6, 2022 11:17 AM <br />To: Rivera, Stacy [EHD] <br />Subject: RE: SR0085819 - 4850 S. Hwy 99, Stockton <br />Attachments: Bonder Training - LC Services - Smith NOV.pdf; Michael Lemon - Bravo.pdf; Michael <br />Lemon - ICC - InstallationRetrofitting.pdf; Michael Lemon - OPW - EVR UST <br />Certificate.pdf; Michael Lemon - Unisource Flexible Connectors.pdf; Michael <br />Lemon -Modern Welding.pdf, Cliffton Woods - FFS - Submersible Pumps and MLLD.pdf; <br />Cliffton Woods - ICC - UST Installation.Retrofitting2022.pdf; Cliffton Woods - ICC - UST <br />Service Tech nician2022.pdf; Cliffton Woods - VR - ATG Technician.pdf; Cliffton Woods - <br />VR - Dispenser Recertification2022.pdf <br />And the Certs <br />James Otto <br />LC Services - Engineering Division <br />3887 N. Valentine Ave. <br />Fresno, Ca. 93722 <br />Phone: (559)444-1730 <br />Email: eneineerinedivision(@Icservices.com <br />Website: www.Icservices.com <br />From: Rivera, Stacy [EHD] <br />Sent: Tuesday, December 6, 2022 10:55 AM <br />To: Engineering Division <br />Subject: SR0085819 - 4850 S. Hwy 99, Stockton <br />Hi James, <br />I have completed the review of the underground storage tank installation application for 4850 S. Hwy 99, Stockton <br />(SR0085819). The following items are needed. <br />1. Provide current contractor's training certifications for installation of all proposed UST equipment/components. <br />The cut sheet for the 7,500/7,500 gallon split tank only shows two tank collars, the same number as the single <br />compartment 15,000 gallon tank. To clarify, the turbine and spill containers will be inside the same sump on the <br />diesel and 91 tank, but inside separate sumps on the 87 tank? <br />3. Drawings do not include a vent sump. The comments indicate updated pages C1, S1, and F1, but these were not <br />included in the attachments. <br />4. Page T4 includes a cut sheet for a 12,000 gallon tank. No mention of a 12,000 gallon tank is made in the rest of <br />the submittal. <br />5. Vacuum zones on page M1 indicate there will be separate diesel and 91 turbine and fill sumps. This is not <br />consistent with the cut sheet (page T2) and page T3. <br />