Laserfiche WebLink
z. auiN GZ SAN J OAQ U I N Environmental Health Department <br /> P <br /> "i i` iCOUNTY Jasjit Kang , REHS , Director <br /> Greatness grows here . Muniappa Naidu, REHS , Assistant Director <br /> PROGRAM COORDINATORS <br /> Jeff Carruesco , REHS , RDI <br /> Willy Ng , REHS <br /> Steven Shih , REHS <br /> Elena Manzo , REHS <br /> Natalia Subbotnikova , REHS <br /> December 15 , 2023 <br /> Greg Slunaker <br /> Tank-Tek Environmental Corp <br /> P . O . Box 5850 <br /> Riverside , CA 92517 <br /> Greg Slunaker < Gregs (@Tank-Tek . Com > <br /> Bud Mccuaig < bmccuaig (a) )etro- a . com > <br /> Re : Kaiser Permanente SR0087099 <br /> 7373 West Ln , Stockton , CA 95210 <br /> The San Joaquin County Environmental Health Department ( EHD) has completed the review of the <br /> application for a permit to do the following on the underground storage tank ( UST) system at the above <br /> noted address : <br /> • Install a new transition sump <br /> • Install a new Veeder- Root sensor inside the transition sump <br /> The permit has been approved with the following conditions : <br /> 1 . Contact the local fire district , the San Joaquin Valley Air Pollution Control District , and the local <br /> community development department for any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for written approval <br /> prior to commencing work . All new submittals supersede previous ones . <br /> 3 . Email notification to ust(c�sigov . or.1 to arrange the following inspection appointments . <br /> All appointments must be scheduled at least 48 hours in advance . <br /> a . A secondary containment test must be performed on the transition sumps in <br /> accordance with the manufacturer' s guidelines . <br /> b . Sensor functionality : Functionality of the monitoring system must be verified to ensure <br /> that monitoring has been restored to meet the requirements of Title 23 California Code <br /> of Regulations and the Health & Safety Code . <br /> c . Visual inspection of the piping within the dispensers <br /> 4 . Secondary containment testing for the installed transition sump is required six months after <br /> installation . Provide 48 hours notification to the EHD when this test is scheduled . <br /> 5 . Any individual installing underground storage systems or components must possess , or work <br /> under the direct and personal supervision of an individual physically present at the work site at <br /> all times while work is being performed who possesses , all of the following : <br /> • One of several permissible valid , current contractor licenses issued by the Contractors <br /> State License Board ( CSLB) <br /> • A current UST Installation/ Retrofitting certificate issued by the International Code Council <br /> ( ICC ) <br /> 1868 E . Hazelton Avenue Stockton , California 95205 T 209 468-3420 1 F 209 464-0138 1 www. sjgov . org/ehd <br />