Laserfiche WebLink
1 . Diesel fuel FOS/FOR (Omega DoubleTrac) from exterior wall to new day tank in <br /> GREEN. <br /> S 2 . Existing black iron pipe from exterior wall to existing day tank in RED . <br /> 3 . New installation bypasses existing aboveground pipe and day tank. All new piping to <br /> Generator new day tank. <br /> 4 . New pipe is in floor trench with Veeder Root sensor. <br /> 5 . UST pipe run is 145 ' . Pipe daylights outside of building (see below) . Aboveground <br /> pipe enters building, then 90 deg. to North inside building to new day tank �25 ' in <br /> pipe trench in floor. <br /> 6 . This is a ` suction ' system. Utilizes foot valve at UST. <br /> New day tank <br /> . . . . . . . ..... .. ..... .... .. .. . . <br /> Existing day tank <br /> s, <br /> Kaiser Stockton <br /> New day tank installation project <br /> Petro-Analytical, Inc. <br /> 2/17/23 <br /> Underground pipe daylight New day tank <br />