Laserfiche WebLink
Underground Stora F . <br /> Designated UST O Aerator Vige Tank <br /> sual Inspection Report <br /> 10• TESTING AND MAINTENANCE — <br /> Yes No NA Date last <br /> Has monitoring system certification been completed wi ' Performed <br /> 12 months? p thrn the past <br /> Has spill co ;� 6122122 <br /> ntainer testing been completed within the past <br /> 12 months? R✓ ❑ 0 6122122 <br /> Has overfill prevention equipment inspection been completed within <br /> the past 36 months? 6116121 <br /> Has secondary containment testing been completed within the past ❑ <br /> 36 months? 418121 <br /> Has tank tightness testing been completed within required ❑ ❑ <br /> timeframes? <br /> Has line tightness testing been completed within the required ❑ ❑ 0 <br /> timeframes? <br /> Other Test/ Maintenance: ❑ ❑ 0 <br /> Other Test / Maintenance: ❑ ❑ 0 <br /> Other Test/ Maintenance: <br /> 11. FACILITY EMPLOYEE TRAINING Yes No i <br /> Have all individuals performing facility employee duties received the required facility ❑ <br /> employee training within the past 12 months? <br /> 13, COMMENTS <br /> This section maybe used to record comments or observations that are not current compliance <br /> deficiencies. <br /> rs marked "NO"mus be described by the designated UST operator in Section 3. <br /> All ansWe Page 4 of 4 <br /> Y <br /> 2 <br />