My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 11:23:47 AM
Creation date
6/20/2023 9:28:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SSP 19- LOWER TUBE ASSEMBLY FOR STANDARD VAPOR T*Fff MoODEk.S,PROC,>15E0 <br /> if a vise is used,clamp on the valve body tasti rig only lo TO STEP 20 Oil PAGE 14, <br /> avoid damage to the float and lubes. Thwead the lower <br /> tune auto the vaI"body untiI the lower tube bottoms FOR TESTABLE MODELS,PROCEED TO PAGE 13. <br /> out on valve beady. Tube can be tightened by hand or <br /> with a strap wrench. E a strap wrench is used try to po- <br /> sitian it on the threaded insert portion of the lower tube <br /> to prevent damaging the tube. <br /> Threaded Inse <br /> Fl M"18 <br /> NOTE;Beivre installing the valve in the lank,a pnes- <br /> r urge test can be pat4crnwd on the valve to check W <br /> vaportghtnem Sad off both ends of the tube with <br /> kntUtable piumbdWs Plugs-Apply a rna:tlmu m 7 V <br /> W.G(113 PSI)air pressure. t premure does not Fold <br /> and a le k4mn ire kxated witft soap rrolutfoM dei not <br /> Install tNevahv. Sand the vahre tea&to VPW for <br /> warm wry evaluation. <br /> CAUTION:Do not crver-pwssmixe. ll tr ss pressure <br /> can da mmW the vaWe. <br /> STEP 19: CETT LMM TUBE <br /> M"sud rig from the underside of the i Met tube flange. <br /> mark the overall lerxith of the drop tube a distance of <br /> (B)minus 6 . Detemvwdimension IB)from the meas- <br /> urements taken in Step 1,Figure i (fop lad the Facc Seal <br /> Adapter below the drain valve outlet In rhe spill con- <br /> tainer to the bottom of the tank). Saw off the excess <br /> tube at a 4"egree angle or per,local codes or require- <br /> ments and file off any sharp burrs(Re eto Figure 24)_ <br /> Optlonai: Install the OPW Tank bottom Protector <br /> on the byes tube"Ae4er to%nstaliabpo instructions Sup <br /> plied with the Tank Bottom Protector)- <br /> IMPORTANT:Remove all chips and shavings out of <br /> the tut imd of the tube. DO NOT remove chips and <br /> shavings by dumping thru valve body. <br /> .x <br />
The URL can be used to link to this page
Your browser does not support the video tag.