Laserfiche WebLink
iota CG RS <br /> en Hnnce❑IE—--T— SOLUTIONS OELIVEREO <br /> Test Certification <br /> Post Installation Enhanced Leak Detection (ELD) <br /> Location: CGRS Project No : 61-25941 <br /> Grappa Market Shell Test Date: June 30, 2023 <br /> 710 N. Jacktone Rd CGRS Techs: Sergio L. Nunez <br /> Ripon, CA 95366 <br /> This document certifies that the UST systems listed below at the above referenced location have been tested <br /> and passed the iota° VaporTite V005 tightness test and iotaVisionT' 1-005. CGRS further certifies that the <br /> iota° VaporTite V005 and iotaVisionTm L005 meets the post installation testing requirements for post <br /> installation testing for newly installed underground storage tank systems as per the California Health and <br /> Safety Code, Chapter 6.7, section 25290.1(j)(1). <br /> Post Installation ELD Test Results <br /> 87 Octane Primary Containment System PASS <br /> 91 Octane Primary Containment System PASS <br /> Diesel Primary Containment System PASS <br /> E85 Primary Containment System PASS <br /> IOTA Tech Signature: 2 L46/30/2023 <br /> Sergio . Nunez CA Tank Tester#06-1727 Date <br /> Reviewed by: qe::�E� 7/3/2023 <br /> Chris Murphy D rector of CA Services Date <br />