Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 16 -7 <br /> Are both vent and tank riser piping F1 Yes PLYes Yes Yes <br /> secondarily contained? ❑ No ❑ No ❑ No ❑ No <br /> OPE Model IF E_Rw — <br /> What is the OPE response when activated? Shut off El Shut off ® Shut off R] Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> ❑Restricts ❑Restricts ❑Restricts ❑Restricts <br /> Flow Flow Flow Flow <br /> ❑ Audible ❑ Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑ Visual ❑ Visual ❑ Visual ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ❑ Yes* ❑ Yes* ❑ Yes* ❑ Yes* <br /> that may interfere with the OPE operation? 4 No 0 No <br /> No VL No <br /> At what level in the tank is the OPE set to [ <br /> activate? Inches from bottom of tank 9 �1 '-{ G1 <br /> What is the percent capacity of the tank at <br /> which the OPE activates? �D5 �y n� 3��f 0 �fy <br /> Is the OPE in proper operating condition to 5�-Yes ® Yes 13 Yes C3 Yes <br /> respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results E Pass 0 Pass 0 Pass Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> * Mark here if: <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />