My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
515
>
2300 - Underground Storage Tank Program
>
PR0231400
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:40 AM
Creation date
6/27/2023 11:05:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231400
PE
2361
FACILITY_ID
FA0003539
FACILITY_NAME
DIAMOND GAS & MARKET #10
STREET_NUMBER
515
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23309031
CURRENT_STATUS
01
SITE_LOCATION
515 W ELEVENTH ST STE 301
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for S B GAS & MARKET as of August 15, 2023. <br /> Open violations from July 05, 2023 inspection <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation #214 -Failure to comply with UST operating permit conditions. <br /> OBSERVATION: The diesel tank was converted to bio-diesel approximately mid-May and a permit was not obtained <br /> from the EHD. <br /> REGULATION GUIDANCE: Emergency repairs relating to UST system monitoring and release detection may be <br /> performed by a properly licensed, trained, and certified contractor pursuant to the EHD's policy and a permit <br /> obtained within one business day from the EHD. All other repairs must have a permit submitted to and approved by <br /> the EHD prior to beginning work. <br /> CORRECTIVE ACTION: Immediately obtain a permit from the EHD for the change of product for tank#3 from <br /> diesel to bio-diesel . A"Failure to Obtain a Permit' penalty applies. <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation #318 -Failed to meet spill container requirements. <br /> OBSERVATION The premium direct-bury spill container failed when tested. <br /> REGULATION GUIDANCE: All spill containers shall have a minimum capacity of five gallons and be capable of <br /> containing a spill or overfill until it is detected or cleaned up. <br /> CORRECTIVE ACTION: Immediately discontinue deposition of petroleum into this tank until the component is <br /> repaired or replaced by a properly licensed, trained, and certified contractor under permit and inspection of the EHD. <br /> If the spill container can't be replaced immediately, there is a possibility that the premium UST system may be red <br /> tagged to prevent fuel inputs. <br /> i <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date): <br /> i ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 7 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.