Laserfiche WebLink
Tank Tight Systems, Inc. will be on site Monday, August 28th to replace the direct bury, Unleaded Premium <br /> spill container, and am requesting an inspection prior to backfilling, per the permit requirements. Once that <br /> inspection has been conducted and passed and concrete has been set, we will request a post construction <br /> inspection with your department to conduct a hydrostatic and secondary containment inspection. Please <br /> advise if that inspection request date can be accommodated for. Thank you and have a good rest of your day. <br /> GENERAL ENGINEERING I <br /> TjWNK TIGHT <br /> Service•Testing •Construction <br /> Karina Arman <br /> TTSI Testing Department <br /> testingktank-ti_h <br /> Office: (916) 378-4168 <br /> A Service Station Maintenance Company <br /> POS. Upgrades. Installations. Training. Testing. Repairs. Parts. Signs. Lighting <br /> GENERAL ENGINEERING <br /> TjWNK TIGHT <br /> Service•Testing •Construction <br /> Karina Arman <br /> TTSI Testing Department <br /> testingktank-ti_h <br /> Office: (916) 378-4168 <br /> A Service Station Maintenance Company <br /> POS. Upgrades. Installations. Training. Testing. Repairs. Parts. Signs. Lighting <br /> 3 <br />