Laserfiche WebLink
�* S JCOG, Inc. <br />555 East Weber Avenue • Stockton, CA 95202 • (209) 235-0574 • Email: Boyd®sjcog.org <br />San Joaquin Counhj Multi -Species Habitat Conservation & Open Space Plan (SJMSCP) <br />SJMSCP RESPONSE TO LOCAL JURISDICTION (RTLJ) <br />ADVISORY AGENCY NOTICE TO SJCOG, Inc. <br />To: Nancy Arroyo, San Joaquin County, Community Development Department <br />From: Laurel Boyd, SJCOG, Inc. Phone: (209) 235-0574 Email: boyd@sjcog.org <br />Date: June 28, 2023 <br />-Local Jurisdiction Project Title: PA -2300113 (A) <br />Assessor Parcel Number(s): 103-020-12 <br />Local Jurisdiction Project Number: PA -2300113 (A) <br />Total Acres to be converted from Open Space Use: Unknown <br />Habitat Types to be Disturbed: Urban Habitat Land <br />Species Impact Findings: Findings to be determined by SJMSCP biologist. <br />Dear Ms. Arroyo: <br />SJCOG, Inc. has reviewed the project referral for PA -2300113 (A). This project consists of an Administrative Use Perrnit <br />application for an unmanned faux water tank telecommunication tower, with 3 ground mount equipment cabinets, and a 30kW, 80 foot tall <br />emergency power backup generator within a 30 x 30, or 900 square foot lease area. The project site is located on the east side of N. <br />Alpine Road, Stockton (APN/Address: 103-020-12 / 848 N. Alpine Road, Stockton). <br />San Joaquin County is a signatory to San Joaquin County Multi -Species Habitat Conservation and Open Space Plan <br />(SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br />and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br />Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br />Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br />SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br />project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br />amount and kind equal to that provided in the SJMSCP. <br />This Project is subject to the SJMSCP. This can be up to a 90 day process and it is recommended that the project <br />applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant obtain an <br />information package. litti)://www.sicog.org <br />Please contact SJMSCP staff regarding completing the following steps to satisfy SJMSCP requirements: <br />Schedule a SJMSCP Biologist to perform a pre -construction survey prior to any ground disturbance <br />SJMSCP Incidental take Minimization Measures and mitigation requirement: <br />Incidental Take Minimization Measures (ITMMs) will be issued to the project and must be signed by the project applicant prior to any <br />ground disturbance but no later than six (6) months from receipt of the ITMMs. If ITMMs are not signed within six months, the applicant <br />must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant, SJCOG, Inc. staff will sign the ITMMs. This <br />is the effective date of the ITMMs. <br />Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br />Upon issuance of fully executed ITMMs and prior to any ground disturbance, the project applicant must: <br />a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered (the bond <br />should be valid for no longer than a 6 month period); or <br />b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered; or <br />C, Dedicate land in -lieu of fees, either as conservation easements or fee title; or <br />d. Purchase approved mitigation bank credits. <br />Within 6 months from the effective date of the ITMMs or issuance of a building perm it, whichever occurs first, the project applicant must: <br />a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered; or <br />b. Dedicate land in -lieu of fees, either as conservation easements or fee title; or <br />C. Purchase approved mitigation bank credits. <br />