My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO0053618
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2401
>
2500 – Emergency Response Program
>
CO0053618
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2023 1:53:04 PM
Creation date
7/11/2023 1:10:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2500 – Emergency Response Program
RECORD_ID
CO0053618
PE
2546
FACILITY_NAME
LEPRINO FOODS
STREET_NUMBER
2401
Direction
N
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307050
ENTERED_DATE
3/31/2021 12:00:00 AM
SITE_LOCATION
2401 N MACARTHUR DR
RECEIVED_DATE
3/31/2021 12:00:00 AM
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\bmascaro
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUSTIFICATION <br />Calculations <br />Energy Labor <br />Yield Additions <br />Subtractions Write-offs <br />Budget accounts affected Savings / Year <br />PAYBACK PERIOD <br />Years <br />Years <br />Plant Controller: <br />PROJECT JUSTIFICATION <br />2. Estimate the monthly savings of doing this project. <br />3. Divide line #1 by line #2. This is your estimated payback in months. <br />PAYBACK ANALYSIS WORKSHEET <br />1. Estimate the total cost of the project including incidental cost(s). (Total AFE Cost) <br />PAYBACK (1) Page ____ of ____ <br />AFE TRACKING #: <br />DATE: <br />SUBMITTED BY: <br />20045 Power Electricity $22000 <br />$ 1,833.00 <br />96.00 <br />8.00 <br />10.00 <br />Running hot gas condenser coils is much more energy efficient than running electric heat ones. <br />Cost of running the rail dock doors is $7.5k for condenser heat vs $19k for electric heat per year. <br />Cost of running the truck dock door is $8.5k for the condenser heat vs. $13.5k for the electric heat per year. <br />Cost of running the pallet entery door is $7.5k for the condenser heat vs. $12k for the electric heat per year. <br />Total savings of around $22k per year to run condenser heat vs. electric heaters. <br />108018207-02 <br />11/27/2018 <br />Ben Schlegelmilch <br />Lisa Melo <br />$175,970 <br />Storage Freezer Ice Safety Improvements - Supplement 2 Hot Gas Lines
The URL can be used to link to this page
Your browser does not support the video tag.