Laserfiche WebLink
AFE TRACKING #: <br />DATE: <br />SUBMITTED BY: <br />Yes No NA <br />(Include applicable drawings and process descriptions as needed for clarity - if the project involves changes to the <br />ammonia system, include equipment P&ID's and mark affected equipment tags.) <br />The following checklist will help determine the need for modification of government issued facility <br />permits and their operating conditions. The checklist will also aid in scheduling to ensure that <br />appropriate permits and/or permit modifications are submitted and approved prior to equipment <br />purchase or facility modifications or construction. The Project Manager is personally responsible for <br />reviewing these questions and describing any impacts anticipated that might fall under the listed pro- <br />grams. <br />The Plant Controller will coordinate with the Technical Services Director of Environmental <br />Operations, the Project Manager, and Plant Engineer on each project that has been determined to <br />have a potential impact on the listed programs. This will ensure proper environmental mitigation <br />has been put in place prior to project execution. <br />Permits and permit modifications are issued at the discretion of the issuing agency. In every case, <br />permit modifications need to be addressed early in the project to allow for issuance of changes - in <br />some cases issuing agencies have up to 6 months to act on permits, including public notification <br />periods. The Director of Technical Services, Environmental Operations will coordinate agency <br />contacts for the purposes of permit issuance and modifications. <br />Indicate below if the project will result in any of the following: (Attach complete explanation of "yes" answers.) <br />Increase / decrease consumption of CIP chemicals (+/-5% plant total of bulk chemicals <br />or 10% by department) <br />Increase / decrease cow water demand or usage (+/-5% of total cow water generated <br />by whey plant) <br />Clean Water Act <br />Increase / decrease plant process wastewater flow (+/-5% total plant flow or 10% <br />department flow) <br />Increase / decrease product losses to the drain (+/-5% total plant flow or 10% <br />department BOD) <br />Increase / decrease in brine from any system due to mechanical or process changes <br />(+/-50 gallons in process) <br />ENVIRONMENTAL STATEMENT CHECK LIST <br />Increase / decrease the amount of any characteristic of sanitary wastewater (all <br />changes to non process sewers) <br />Project Scope Description <br />The following information is required for preparation of an environmental statement: <br />ENVIRONMENTAL Page ____ of ____ <br />108018207-02 <br />11/27/2018 <br />Ben Schlegelmilch <br />Storage Freezer Ice Safety Improvements - Supplement 2 Hot Gas Lines