Laserfiche WebLink
<br />4 <br /> <br />Project assumptions and clarifications: <br />General: <br />1. Sales tax Included at 8.25% no materials. <br />2. Our pricing does not include permits and license fees. If such are required, costs incurred will be billed to customer as <br />time and material. Schedules provided do not include any delays that may result. <br />3. We have not included anything for improvement of the building enclosure, interior or exterior. <br />4. We have not included any fire protection changes. Or relocation of existing sprinkler systems. <br />5. The attached terms and conditions are intended to be the basis for the project. Modifications to the terms and conditions <br />may result in a price adjustment based on the value of the risk. <br />6. Stand by time: Our proposal is based on items that are provided by Stellar. Lost time resulting from unforeseen system <br />issues, i.e. existing valves not holding pressure, production overages etc. will be considered as additional cost and <br />presented in writing to management. <br />7. Disposal bin for trash are to be supplied by owner. <br />8. No independent lab testing has been included. No UL certification is included. <br />9. No ammonia leak detection or annunciating <br />Electrical: <br />1. No electrical is included… all electrical (disconnects, power wiring, control wiring) to be done by others. <br />2. Temporary power and lighting is NOT included. <br />3. Customer is to provide electrical power for tools and welders 240 or 460 within work space. <br />4. Customer to provide lighting in work spaces <br />Refrigeration: <br />1. All pipe and fittings are to be import or non-domestic. <br />2. No special inspection or x-ray has been included <br />3. HCR door coils are not included and will be supplied and installed by others <br />4. We assume all existing equipment is in good working condition and will meet the manufacturer’s rated capacities. We <br />have not included any reconditioning or repair of existing equipment. <br />5. Pressure testing of existing equipment may result in Leaks; these leaks are not covered under warranty. Repairs required <br />will be billed as Time and Material. <br />Structural: <br />1. No structural engineering or seismic changes / confirmation. <br />2. No modifications to the roof structure or building are included. <br />