Laserfiche WebLink
3. Engineering Review of Tanks & Equipment Covered by CalARP Program <br />C:\TRICH\Jobs\4515582 Leprino Tracy\Report\Leprino Tracy CalARP 040221.docx 3-15 <br />Table 3-1: Components Covered by CalARP Study <br />Component Label Age Description <br />Main Engine Room <br />HSC-1, HSC-2 & HSC-3 1999 High Stage Compressors <br />HSC-4 2001 Low Stage Compressor <br />LSC-1 1995 Low Stage Compressor <br />LSC-2 1991 Low Stage Compressor <br />LSC-3 1999 Low Stage Compressor <br />HSC-7, HSC-8 & HSC-9 1973 High Stage Compressors <br />SA-1 2002 Suction Trap <br /> Intercooler Yard <br />PRU-1 1999 Pump Recirculating Unit Tank <br />HPR-1 1999 High Pressure Receiver Tank <br />IC-1 1999 Intercooler Tank <br />IB-1 1999 Ice Builder <br /> QLC Engine Room <br />HSC-1, HSC-2 1987 High Stage Compressors <br />LSC-1, LSC-2 1987 Low Stage Compressors <br />IC-1 1987 Intercooler Tank <br />PRU-1 1987 Pump Recirculating Unit Tank <br />HPR-1 1987 High Pressure Receiver Tank <br />SC-3 1990 Swing Compressor <br />Glycol Room 1 <br />GCH-1 & AV-306 1999 Glycol Chiller Skid <br />