Laserfiche WebLink
3. Engineering Review of Tanks & Equipment Covered by CalARP Program <br />C:\TRICH\Jobs\4515582 Leprino Tracy\Report\Leprino Tracy CalARP 040221.docx 3-25 <br /> <br />Figure 3-43: PRU-1 Support Legs Figure 3-44: PRU-1 Skid Anchorage <br /> <br />Figure 3-45: High Pressure Receiver <br />(HPR-1) at Intercooler Yard Figure 3-46: HPR-1 Anchorage <br /> <br />Figure 3-47: Intercooler (IC-1) at <br />Intercooler Yard <br />Figure 3-48: Ice Builder (IB-1) at <br />Intercooler Yard <br /> <br />