4. Summary and Recommendations <br />C:\TRICH\Jobs\4515582 Leprino Tracy\Report\Leprino Tracy CalARP 040221.docx 4-2 <br />4.2 Recommendations <br />Refer to Sections 2 and 3 for detailed descriptions of vulnerabilities observed and <br />recommended actions. A summary of the recommendations is reiterated below: <br />• Continue the five-year CalARP revalidation process as described in Reference 2. <br />• Verify whether anchorage is provided for the Ice Builder (IB-1) located in the <br />Intercooler Yard. If necessary, retain the services of a professional structural <br />engineering company to verify the existing anchorage or design new anchorage. <br />• The glycol chiller and pump skids in Glycol Room 2 are not anchored. Retain the <br />services of a professional structural engineering company to design anchorage <br />for the skids. <br />• Bracing of Evaporators (EV-1 to EV-19) suspended below the roof framing <br />appears marginal depending on the location. Retain the services of a <br />professional structural engineering company to verify any existing bracing and <br />design new bracing as necessary. <br />• Support for ammonia piping at the roof appears to be marginal to inadequate in <br />many locations. Retain the services of a professional structural engineering <br />company to verify the existing support conditions and design additional <br />anchorage or bracing as necessary. In addition, the presence of lateral restraints <br />for ammonia piping to the steel supports should be verified and provided as <br />required. <br />Implementation of these recommendations in a reasonable time would not only lower the <br />risk of seismic induced release of state regulated substances, but also lower the risk of <br />damage to buildings and equipment (i.e. capital loss), improve life-safety and minimize <br />business interruption. <br />